Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 422 SW GREY WAY
HIGH SPRINGS, FL 32643
Parcel #: 10006-224
Acres: 5.03
Owner: Ed & Sybil Sapp
Subdivision: River Rise Residential Unit 1
Zoning: A-3
Flood Zone: X
District: 4
Application #: 43895
Permit #: 000038857
Related Permit: Culvert: 000038858
Submitted: Friday, October 25, 2019
Issued: Tuesday, November 5, 2019
Expires: Monday, July 6, 2020
Completed: Monday, July 6, 2020
Status: Completed
Septic Release? Yes
Notes:
FLOOR ONE FOOT ABOVE THE ROAD
Job Details
This is the construction of a Single Family Dwelling
Heated Area (Sqft) 2436
Total Area (Sqft) 3608
Stories 1
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title Single Family Dwelling
Septic# 19-0775
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Fema map number 12023C0513C
Review Notes
10/25/2019 Point Review - Completed/Sent for Plan Review
10/31/2019 Point Review - Completed/Sent for Plan Review
11/5/2019 Permit Issued Permit # created and approved.
Contractors

This is an owner builder project.

Name/ Business License Title Role
Donald Davis
High Springs Electric Inc.
EC0002306 Electrical Contractor Subcontractor
Donald R Davis
High Springs Electric ,inc.
CAC1815367 Class B A/c Subcontractor
Paul K Coleman
Coleman's Plumbing Inc.
CFC1425624 Certified Plumbing Subcontractor
Lee A Holloway
Ldm Construction Company,inc. & Peninsular Electric Co.
CGC1510178 General Contractor Subcontractor
Lee Holloway
Ldm Construction Co., Inc. & Peninsular Electric Co.
EC0000668 Electrical Contractor Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Electrical - Temporary Service Troy Crews 11/6/2019
Release to power company Troy Crews 11/6/2019
Passed: Plumbing/Gas - 1st Underground Rough–In Tommy Matthews 11/13/2019
Passed: Building - Monolithic Slab Tommy Matthews 11/14/2019
Passed: Engineering - Setbacks Tommy Matthews 11/14/2019
Passed: Electrical - Footer Steel & Grounding Tommy Matthews 11/14/2019
Passed: Building - Ext Strapping/Wall Sheathing Troy Crews 1/2/2020
Passed: Building - Framing Troy Crews 1/2/2020
Passed: Engineering - Initial Driveway Mccormick, David 1/14/2020
Passed: Mechanical - Rough In Troy Crews 1/14/2020
Passed: Electrical - 2nd Rough-In Troy Crews 1/14/2020
Passed: Plumbing/Gas - 2nd Rough-In Troy Crews 1/14/2020
Passed: Building - Insulation Troy Crews 1/21/2020
Passed: Electrical - Permanent Power Need Final Septic Release culvert Approved 5.12.20 Troy Crews 4/30/2020
Septic Release Inspection Need To Pay Assessment Fees. Health Dept 5/7/2020
Passed: Engineering - Final Driveway Mccormick, David 5/12/2020
Release to power company Melissa Garber 5/13/2020
Failed: Building - Final Need Termite Final. Verified Outside Air. Tommy Matthews 7/2/2020
Passed: Building - Final Termite Sticker Received Troy Crews 7/6/2020
Cancelled: Building - Final Final Already Done C.o. Issued Troy Crews 8/3/2020