Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 556 NW HIGH POINTE DR
LAKE CITY, FL 32055
Parcel #: 02202-109
Acres: 2.86
Owner: Brown Road Properties Llc
Subdivision: High Pointe
Zoning: PRD
Flood Zone: X
District: 3
Application #: 43757
Permit #: 000038749
Related Permit: Culvert: 000038750
Submitted: Wednesday, October 9, 2019
Issued: Tuesday, October 15, 2019
Expires: Friday, May 1, 2020
Completed: Friday, May 1, 2020
Status: Completed
Septic Release? Yes
Notes:
HOUSE CLEAR OF 200 BUFFER, FLOOR 1' ABOVE RD
Job Details
This is the construction of a Single Family Dwelling
Heated Area (Sqft) 2381
Total Area (Sqft) 3391
Stories 1
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title SINGLE FAMILY DWELLING
Setbacks Front 30
Setback Side 1 25
Setback Side 2 25
Setbacks Rear 25
Septic# (00-0000) or (X00-000) 19-0738
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Fema map number 12023C0280D
Review Notes
10/15/2019 Permit Issued Permit # created and approved.
Contractors
Name/ Business License Title Role
Isaiah Cully
Ic Construction Llc
CBC1259655 Building Contractor Contractor
Inspections
Inspection Notes Performed By Date
Passed: Building - Footer Troy Crews 10/18/2019
Passed: Engineering - Setbacks Troy Crews 10/18/2019
Passed: Engineering - Initial Driveway Mccormick, David 10/21/2019
Septic Release Inspection Health Dept 10/22/2019
Passed: Plumbing/Gas - 1st Underground Rough–In Tommy Matthews 11/4/2019
Passed: Building - Slab Troy Crews 11/8/2019
Release to power company Tommy Matthews 11/12/2019
Passed: Electrical - Temporary Service Tommy Matthews 11/13/2019
Passed: Building - Ext Strapping/Wall Sheathing Tommy Matthews 12/6/2019
Passed: Building - Roof Decking Tommy Matthews 12/6/2019
Failed: Building - Framing Truss Plans Indicate Load Bearing Wall But Foundation Plan Does Not Indicate An Interior Footer. each Side Of Garage Door Is Not As Per Plans. Tommy Matthews 12/9/2019
Passed: Building - Framing Tommy Matthews 12/20/2019
Passed: Electrical - 2nd Rough-In Matt Forsyth 1/31/2020
Passed: Mechanical - Above Ceiling Matt Forsyth 1/31/2020
Passed: Plumbing/Gas - 2nd Rough-In Matt Forsyth 1/31/2020
Passed: Electrical - Temporary Service Troy Crews 2/5/2020
Release to power company Troy Crews 2/5/2020
Failed: Building - Insulation Exstensive Wind Damage Must Be Repaired And Called Back In. Troy Crews 2/7/2020
Passed: Building - Insulation Troy Crews 2/11/2020
Passed: Electrical - Permanent Power Need Driveway Final Troy Crews 4/9/2020
Release to power company Drive Rec'd Laurie Hodson 4/16/2020
Passed: Engineering - Final Driveway Mccormick, David 4/16/2020
Passed: Building - Final Troy Crews 5/1/2020