Search pages and services on the county website.
Choose the colors you prefer.
Permit
487 SW POWELL GLENFORT WHITE, FL 32038
No status updates yet.
Isaiah Cully
Septic Release Inspection
Inspected by Health Dept
Passed: Building - Footer
Inspected by Matt Forsyth
Passed: Engineering - Setbacks
Passed: Electrical - Footer Steel & Grounding
Passed: Plumbing/Gas - 1st Underground Rough–In
Passed: Building - Slab
Inspected by Tommy Matthews
Passed: Building - Roof Decking
Failed: Building - Framing
Nailing Of All Headers Not Correct
Passed: Electrical - 2nd Rough-In
Passed: Mechanical - Rough In
Failed: Plumbing/Gas - 2nd Rough-In
Need Shield Plates In Pex Pipe Master Bathroom
Need Simpson Strapping On Bottom Of All Header Openings
Need Simpson Strapping On Bottom Of Header Are Openings
Passed: Building - Framing
Will Check Nail Plates In Master Bath At Insulation Inspection
Passed: Building - Insulation
Passed: Plumbing/Gas - 2nd Rough-In
Passed: Electrical - Permanent Power
Release to power company
Failed: Building - Final
Gf Ci On Back Porch Will Not Reset Need Water Turned On
Passed: Building - Final