Inspection |
Notes |
Performed By |
Date |
Passed: Electrical - Rough In |
|
Troy Crews |
8/14/2019 |
Passed: Plumbing/Gas - Rough In |
|
Troy Crews |
8/14/2019 |
Failed: Building - Footer |
Covered In Water |
Troy Crews |
8/19/2019 |
Passed: Engineering - Setbacks |
|
Troy Crews |
8/19/2019 |
Passed: Building - Footer |
|
Troy Crews |
8/21/2019 |
Passed: Engineering - Setbacks |
|
Troy Crews |
8/21/2019 |
Passed: Building - Slab |
|
Troy Crews |
8/21/2019 |
Passed: Electrical - Footer Steel & Grounding |
|
Troy Crews |
8/21/2019 |
Passed: Building - Vertical Cells/Columns |
|
Troy Crews |
9/5/2019 |
Passed: Building - Lintel/Tie Beam |
|
Troy Crews |
9/5/2019 |
Passed: Building - Framing |
|
Troy Crews |
9/27/2019 |
Passed: Electrical - 2nd Rough-In |
|
Troy Crews |
9/27/2019 |
Passed: Mechanical - Rough In |
|
Troy Crews |
9/27/2019 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Troy Crews |
9/27/2019 |
Passed: Building - Monolithic Slab |
|
Troy Crews |
10/3/2019 |
Passed: Engineering - Setbacks |
|
Troy Crews |
10/3/2019 |
Cancelled: Engineering - Final Driveway |
8/2/19 David Mccormick Failed. Need To Purchase A Culvert Permit And Install. |
Laurie Hodson |
10/9/2019 |
Failed: Electrical - Permanent Power |
Need Building Secured Door Locks, Completion Of Front Entry Glass, Wire Nut All Open Conductors |
Troy Crews |
10/10/2019 |
Passed: Electrical - Permanent Power |
Need Elevation Letter For Release |
Troy Crews |
10/14/2019 |
Failed: Building - Lintel/Tie Beam |
No Further Inspections Until Stamped Letter Received On Elevation. Note No Inspections This Area In Afternoon. |
Troy Crews |
10/16/2019 |
Passed: Building - Lintel/Tie Beam |
Dumpster Enclosure |
Troy Crews |
10/17/2019 |
Passed: Building - Masonry Wall Reinforcing |
|
Troy Crews |
10/17/2019 |
Release to power company |
|
|
10/22/2019 |
Passed: Electrical - Permanent Power |
Final In Building |
Troy Crews |
10/30/2019 |
Passed: Mechanical - Performance Test and Balance |
|
Troy Crews |
10/30/2019 |
Passed: Plumbing/Gas - Sanitary |
|
Troy Crews |
10/30/2019 |
Passed: Building - Final |
Release Pending Fire Final, And Zoning Final |
Troy Crews |
11/1/2019 |
Passed: Engineering - Zoning Final |
Initial Inspection Failed Due To Two Missing Oak Trees And Fire Hydrant Not In Approved Location. Applicant Applied For A Minor Modification To An Approved Site Plan For The Relocation Of The Fire Hydrant. Fire Department Approved New Location On November 6, 2019. Two Missing Oak Trees Have Been Planted. Engineer Final Complete |
Brandon Stubbs |
11/6/2019 |
Passed: Fire - Fire Final |
Per Tad - He Does Need To Measure Shelving-lh 11/7/19 |
Tad Cervantes |
11/7/2019 |
Passed: Fire - Fire Final |
Shelving Egress |
Tad Cervantes |
11/8/2019 |