Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Commercial Construction Permit
Address 457 DEPUTY J DAVIS LANE
LAKE CITY, FL 32024
Parcel #: 02475-001
Acres: 14.81
Owner: Morrell's Legacy Llc
Subdivision: Building # 4
Zoning: CHI
Flood Zone: X
District: 3
Application #: 42315
Permit #: 000038424
Related Permit:
Submitted: Wednesday, July 31, 2019
Issued: Wednesday, July 31, 2019
Expires: Monday, May 4, 2020
Completed: Monday, May 4, 2020
Status: Completed
Septic Release? Yes
Notes:
SDP 18-06 APPROVED, MINIMUM FLOOR ELEVATION IS 162.50', NEED ELEVATION CONFIRMATION LETTER AT SLAB, ELEVATION LETTER REC'D AT 162.56'
Job Details
This is the construction of a: COMM BUILDNG #4
Heated Area (Sqft) 6000.00
Total Area (Sqft) 9000.00
Stories 1
Building Height 20
Driveway access to property: Existing Drive
Is there a Fire Sprinkler System? No
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Business
Occupancy Use Title Office/Storage
Design Occupant Load 39
Setbacks Front 20.00
Setback Side 1 5.00
Setback Side 2 5.00
Setback Rear 15.00
Septic# (00-0000) or (X00-000) 19-0417
Dev Permit # F023-
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Fema map number 12023C0290D
Review Notes
Contractors
Name/ Business License Title Role
Isaiah Cully

CBC1259655
Inspections
Inspection Notes Performed By Date
Release to power company Corrected Power Company Tc 8/26/2019
Passed: Electrical - Temporary Service Troy Crews 8/26/2019
Release to power company Troy Crews 8/26/2019
Passed: Plumbing/Gas - Underground Rough-In Troy Crews 9/5/2019
Passed: Building - Slab Troy Crews 9/11/2019
Passed: Electrical - Footer Steel & Grounding Troy Crews 9/11/2019
Passed: Electrical - 2nd Rough-In Rough In Office Areas Troy Crews 11/8/2019
Passed: Building - Framing Office Area Ok,call Back In For Firewall Between Layers Of Rock Troy Crews 11/12/2019
Failed: Mechanical - Above Ceiling Not Complete Call Back In With Insulation Troy Crews 11/15/2019
Passed: Plumbing/Gas - 2nd Rough-In Troy Crews 11/15/2019
Septic Release Inspection Health Dept 11/27/2019
Passed: Mechanical - Rough In Troy Crews 12/4/2019
Failed: Electrical - Permanent Power Need Elevation Confirmation Letter From Surveyor, Rec'd Elev Ltr Troy Crews 12/4/2019
Passed: Electrical - Permanent Power Troy Crews 12/6/2019
Release to power company Troy Crews 12/6/2019
Failed: Building - Final Need Gfci Receptacle Near Service Sink, Thresholds In Interior Exceed 1/2 Inch For Accessibility.accessible. Parking And Striping Not Complete. East Side Lease Space Toilet Exceeds 18 Inch Maximum From Wall. Troy Crews 12/13/2019
Failed: Engineering - Zoning Final Site Not Constructed In Accordance With Approved Site & Development Plan. Brandon Stubbs 12/16/2019
Passed: Fire - Aboveground Hydro - Sprinkler Tad Cervantes 12/17/2019
Passed: Fire - Aboveground Sprinkler - Visual (On Site) Tad Cervantes 12/17/2019
Passed: Fire - Fire Final Tad Cervantes 12/17/2019
Passed: Fire - Fire Final Tad Cervantes 12/17/2019
Passed: Engineering - Zoning Final Brandon Stubbs 4/30/2020
Passed: Building - Final Troy Crews 5/4/2020