Permit
457 DEPUTY J DAVIS LANELAKE CITY, FL 32024
No status updates yet.
Isaiah Cully
Release to power company
Corrected Power Company
Inspected by Tc
Passed: Electrical - Temporary Service
Inspected by Troy Crews
Passed: Plumbing/Gas - Underground Rough-In
Passed: Building - Slab
Passed: Electrical - Footer Steel & Grounding
Passed: Electrical - 2nd Rough-In
Rough In Office Areas
Passed: Building - Framing
Office Area Ok,call Back In For Firewall Between Layers Of Rock
Failed: Mechanical - Above Ceiling
Not Complete Call Back In With Insulation
Passed: Plumbing/Gas - 2nd Rough-In
Septic Release Inspection
Inspected by Health Dept
Passed: Mechanical - Rough In
Failed: Electrical - Permanent Power
Need Elevation Confirmation Letter From Surveyor, Rec'd Elev Ltr
Passed: Electrical - Permanent Power
Failed: Building - Final
Need Gfci Receptacle Near Service Sink, Thresholds In Interior Exceed 1/2 Inch For Accessibility.accessible. Parking And Striping Not Complete. East Side Lease Space Toilet Exceeds 18 Inch Maximum From Wall.
Failed: Engineering - Zoning Final
Site Not Constructed In Accordance With Approved Site & Development Plan.
Inspected by Brandon Stubbs
Passed: Fire - Aboveground Hydro - Sprinkler
Inspected by Tad Cervantes
Passed: Fire - Aboveground Sprinkler - Visual (On Site)
Passed: Fire - Fire Final
Passed: Engineering - Zoning Final
Passed: Building - Final