Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 853 SW CHESTERFIELD CIR
LAKE CITY, FL 32024
Parcel #: 03117-113
Acres: 0.51
Owner: Delta Omega Properties
Subdivision: Crosswinds
Zoning: RSF-2
Flood Zone: X
District: 3
Application #: 42288
Permit #: 000038405
Related Permit: Culvert: 000002849
Submitted: Thursday, July 25, 2019
Issued: Thursday, July 25, 2019
Expires: Wednesday, February 12, 2020
Completed: Wednesday, February 12, 2020
Status: Completed
Septic Release? Yes
Notes:
NOC ON FILE, FLOOR 1' ABOVE ROAD, 8/9/19 REC'D ENGINEER FLOOR HEIGHT LETTER - F.F.E. SHALL BE 4" ABOVE THE CROWN OF THE ADJACENT ROADWAY AND CONTRACTOR SHALL ENSURE POSITIVE DRAINAGE AWAY FROM THE STRUCTURE ON ALL SIDES.
Job Details
This is the construction of a SFD/UTILITY
Heated Area (Sqft) 1618.00
Total Area (Sqft) 2325.00
Stories 1
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Setbacks Front 25.00
Setback Side 1 10.00
Setback Side 2 10.00
Setbacks Rear 15.00
Septic# (00-0000) or (X00-000) 19-0528
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Fema map number 12023C0381D
Review Notes
11/1/2019 Point Review - Status Cleared
Contractors
Name/ Business License Title Role
James Lipscomb

County License & State License & Liability Insurance & Workers Comp Expired.
CBC1253543
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway Mccormick, David 7/26/2019
Passed: Electrical - Temporary Service Ground Rod Should Be Installed Flush With Ground. Will Review On Next Inspection. Tommy Matthews 8/14/2019
Release to power company Tommy Matthews 8/14/2019
Passed: Plumbing/Gas - Underground Rough-In Tommy Matthews 8/26/2019
Passed: Building - Monolithic Slab Need Elevation Confirmation Ele.was Confirmed Onsept. 6 With Contractor Matt Forsyth 9/6/2019
Passed: Engineering - Setbacks Matt Forsyth 9/6/2019
Passed: Building - Ext Strapping/Wall Sheathing Matt Forsyth 9/19/2019
Passed: Building - Roof Decking Matt Forsyth 10/4/2019
Cancelled: Building - Roof Decking Troy Crews 10/10/2019
Passed: Building - Framing Tommy Matthews 10/10/2019
Passed: Electrical - 2nd Rough-In Tommy Matthews 10/25/2019
Passed: Mechanical - Above Ceiling Tommy Matthews 10/25/2019
Passed: Plumbing/Gas - 2nd Rough-In Tommy Matthews 10/25/2019
Passed: Building - Insulation Tommy Matthews 10/30/2019
Passed: Electrical - Permanent Power Need Drive Ok 1/16 And Septic Release, Drive Rec'd 1/16/2020 Matt Forsyth 1/15/2020
Passed: Engineering - Final Driveway Mccormick, David 1/16/2020
Release to power company Mg 1/29/2020
Septic Release Inspection Health Dept 1/29/2020
Passed: Building - Final Co Pending Approval Of Blower Door Test. Tommy Matthews 2/12/2020