Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Mccormick, David |
7/26/2019 |
Passed: Building - Footer |
|
Tommy Matthews |
8/12/2019 |
Passed: Engineering - Setbacks |
|
Tommy Matthews |
8/12/2019 |
Passed: Electrical - Temporary Service |
|
Tommy Matthews |
8/23/2019 |
Release to power company |
|
Tommy Matthews |
8/23/2019 |
Passed: Plumbing/Gas - Underground Rough-In |
|
Tommy Matthews |
8/23/2019 |
Failed: Building - Slab |
No Plastic Installed |
Troy Crews |
8/26/2019 |
Passed: Electrical - Temporary Service |
|
Tommy Matthews |
8/30/2019 |
Release to power company |
|
Tommy Matthews |
8/30/2019 |
Passed: Building - Slab |
Pending Design Of Interior Footing. Need Elevation Of Slab After Slab Is Poured. |
Tommy Matthews |
8/30/2019 |
Passed: Building - Ext Strapping/Wall Sheathing |
|
Troy Crews |
11/8/2019 |
Failed: Building - Framing |
Anchor Bolts Some Missing, Also Some Missing Washers. Need Framing Details From Architect For Front Porch Framing, Check Truss Bracing And Strapping Some Missing. Also Nail Off Buckets For Porch Post Bottom. Call Back In With Rough In Inspections. |
Troy Crews |
11/8/2019 |
Failed: Building - Framing |
Garage Tie Downs Not Done |
Troy Crews |
11/25/2019 |
Failed: Mechanical - Rough In |
Bath Fans Not Ducte |
Troy Crews |
11/25/2019 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Troy Crews |
11/25/2019 |
Passed: Electrical - 2nd Rough-In |
|
Troy Crews |
11/25/2019 |
Passed: Building - Framing |
|
Troy Crews |
12/6/2019 |
Passed: Mechanical - Rough In |
|
Troy Crews |
12/6/2019 |
Passed: Building - Insulation |
|
Troy Crews |
1/30/2020 |
Septic Release Inspection |
Need Elevation Letter |
Health Dept |
4/14/2020 |
Passed: Engineering - Final Driveway |
|
Mccormick, David |
5/4/2020 |
Failed: Electrical - Permanent Power |
Garage Needs To Be Lockable Because Electrical Panel Is Located In Garage. Need Elevation Certificate. |
Tommy Matthews |
5/6/2020 |
Failed: Electrical - Permanent Power |
Need Elevation Letter, Rec'd 5.11.20 |
Troy Crews |
5/11/2020 |
Passed: Electrical - Permanent Power |
|
Tommy Matthews |
5/12/2020 |
Release to power company |
|
Tommy Matthews |
5/12/2020 |
Passed: Building - Final |
|
Matt Forsyth |
5/18/2020 |