Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 576 SW KIRBY AVE
LAKE CITY, FL 32025
Parcel #: 02919-013
Acres: 0.74
Owner: Diy Development Llc
Subdivision: Kirby Oak
Zoning: RSF-3
Flood Zone: X
District: 3
Application #: 42209
Permit #: 000038360
Related Permit: Culvert: 000002846
Submitted: Monday, July 15, 2019
Issued: Monday, July 15, 2019
Expires: Tuesday, January 21, 2020
Completed: Tuesday, January 21, 2020
Status: Completed
Septic Release? Yes
Notes:
FLOOR ONE FOOT ABOVE THE ROAD NOC REC'D.
Job Details
This is the construction of a SFD, UTILITY
Heated Area (Sqft) 1496.00
Total Area (Sqft) 2000.00
Stories 1
Setbacks Front 25.00
Setback Side 1 10.00
Setback Side 2 10.00
Setbacks Rear 15.00
Septic# (00-0000) or (X00-000) 18-0604
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Fema map number 12023C0289D
Review Notes
Contractors
Name/ Business License Title Role
Isaiah Cully

CBC1259655
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway Mccormick, David 7/16/2019
Passed: Building - Footer Matt Forsyth 7/16/2019
Passed: Engineering - Setbacks Matt Forsyth 7/16/2019
Failed: Plumbing/Gas - Underground Rough-In No Water In Stand Pipe Tommy Matthews 8/5/2019
Passed: Plumbing/Gas - Underground Rough-In Tommy Matthews 8/6/2019
Passed: Building - Slab Tommy Matthews 8/13/2019
Release to power company Mf 8/22/2019
Passed: Electrical - Temporary Service Matt Forsyth 8/22/2019
Release to power company Matt Forsyth 8/22/2019
Passed: Building - Roof Decking Troy Crews 9/13/2019
Passed: Building - Ext Strapping/Wall Sheathing Troy Crews 9/13/2019
Rescheduled 9/16/2019:Building - Framing Matt Forsyth 9/13/2019
Failed: Building - Framing Need Proper Simpsons Hanger For Two Ply Girder 1400 Pounds Of Uplift Matt Forsyth 9/16/2019
Passed: Building - Framing Matt Forsyth 9/27/2019
Passed: Electrical - 2nd Rough-In Matt Forsyth 9/27/2019
Failed: Mechanical - Rough In Mechanical Rough Has Not Been Completed Matt Forsyth 9/27/2019
Passed: Plumbing/Gas - 2nd Rough-In Matt Forsyth 9/27/2019
Passed: Mechanical - Rough In Matt Forsyth 10/2/2019
Passed: Building - Insulation Attic Will Be Blown Insulation Matt Forsyth 10/9/2019
Passed: Engineering - Final Driveway Mccormick, David 12/27/2019
Passed: Electrical - Permanent Power Need Septic Release Matt Forsyth 12/30/2019
Release to power company Blower Door Test Rec'd 1-10-20 Lh 1/9/2020
Septic Release Inspection Health Dept 1/9/2020
Passed: Building - Final Matt Forsyth 1/21/2020
Release to power company Matt Forsyth 1/21/2020