Permit
7357 SW ELIM CHURCH RDFORT WHITE, FL 32038
No status updates yet.
Isaiah Cully
Passed: Building - Footer
Inspected by Tommy Matthews
Passed: Engineering - Setbacks
Passed: Electrical - Footer Steel & Grounding
Failed: Plumbing/Gas - Underground Rough-In
Plumbing Covered Up. Five Foot Head Has Lost Pressure. Call For Reinspection.
Failed: Building - Slab
Held Up Waiting On Plumbing Inspection To Be Resolved.
Passed: Building - Slab
Passed: Plumbing/Gas - Underground Rough-In
Passed: Building - Roof Decking
Passed: Building - Ext Strapping/Wall Sheathing
Failed: Building - Framing
Need Engineers Acceptance To Front Porch Modification.
Failed: Electrical - Rough In
Framing Not Passed
Inspected by Troy Crews
Failed: Mechanical - Rough In
Failed: Plumbing/Gas - Rough In
Passed: Building - Framing
Passed: Electrical - Rough In
Passed: Mechanical - Rough In
Passed: Plumbing/Gas - Rough In
Failed: Building - Insulation
$50 Reinspection Fee. Insulation Not Complete. Inspection Time4:10 Pm
Paid 9-24-19, Need Reinspection Fee Paid
Inspected by Matt Forsyth
Passed: Building - Insulation
A
Passed: Electrical - Permanent Power
Release to power company
Failed: Building - Final
Home Has Plumbing And Ele. Work Unfinished
Passed: Building - Final
Need Driveway And Blower Door Test-- Bdt- Rec'd, Existing Drive