Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Mccormick, David |
7/10/2019 |
Passed: Electrical - Temporary Service |
|
Troy Crews |
7/10/2019 |
Release to power company |
|
Troy Crews |
7/10/2019 |
Passed: Building - Footer |
|
Tommy Matthews |
8/8/2019 |
Passed: Engineering - Setbacks |
|
Tommy Matthews |
8/8/2019 |
Passed: Plumbing/Gas - Rough In |
|
Troy Crews |
8/15/2019 |
Passed: Building - Slab |
|
Troy Crews |
8/26/2019 |
Passed: Building - Ext Strapping/Wall Sheathing |
|
Troy Crews |
9/11/2019 |
Cancelled: Building - Ext Strapping/Wall Sheathing |
|
Troy Crews |
9/11/2019 |
Passed: Building - Roof Decking |
|
Troy Crews |
10/2/2019 |
Passed: Electrical - 2nd Rough-In |
|
Tommy Matthews |
11/13/2019 |
Passed: Mechanical - Above Ceiling |
|
Tommy Matthews |
11/13/2019 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Tommy Matthews |
11/13/2019 |
Failed: Building - Framing |
Anchor Bolts Should Be 32" O.c.
approved Truss Drawings Do Not Match What Is Installed.
mid Span Blocking Is Required As Per Plans. Not Installed. |
Tommy Matthews |
11/13/2019 |
Passed: Mechanical - Rough In |
|
Tommy Matthews |
11/13/2019 |
Passed: Building - Framing |
|
Matt Forsyth |
11/14/2019 |
Rescheduled 11/26/2019:Building - Insulation |
|
Janice Williams |
11/25/2019 |
Passed: Building - Insulation |
|
Matt Forsyth |
11/26/2019 |
Passed: Plumbing/Gas - Tub Set/Shower Pan |
|
Matt Forsyth |
1/31/2020 |
Passed: Electrical - Permanent Power |
Need Septic And Driveway Release For Permanent Power |
Matt Forsyth |
3/2/2020 |
Passed: Engineering - Final Driveway |
|
Mccormick, David |
3/3/2020 |
Septic Release Inspection |
|
Health Dept |
3/3/2020 |
Release to power company |
|
Matt Forsyth |
3/4/2020 |
Passed: Building - Final |
|
Matt Forsyth |
4/27/2020 |