Inspection |
Notes |
Performed By |
Date |
Passed: Plumbing/Gas - Underground Rough-In |
Need Compaction Test For Next Inspection. |
Tommy Matthews |
6/6/2019 |
Passed: Building - Footer |
|
Matt Forsyth |
6/12/2019 |
Passed: Engineering - Setbacks |
|
Matt Forsyth |
6/12/2019 |
Passed: Building - Slab |
|
Matt Forsyth |
6/12/2019 |
Passed: Building - Roof Decking |
|
Matt Forsyth |
6/28/2019 |
Failed: Building - Framing |
Windows In Front Need To Be Tempered (3). Need Header At Front Of Fireplace Similar To Windows And Doors. |
Tommy Matthews |
7/31/2019 |
Failed: Plumbing/Gas - Rough In |
Need To Maintain Pressure On Supply Line. |
Tommy Matthews |
7/31/2019 |
Passed: Mechanical - Rough In |
|
Tommy Matthews |
7/31/2019 |
Passed: Electrical - Rough In |
|
Tommy Matthews |
7/31/2019 |
Passed: Building - Framing |
Temp Glass Documents In File. |
Tommy Matthews |
8/6/2019 |
Passed: Plumbing/Gas - Rough In |
|
Tommy Matthews |
8/6/2019 |
Cancelled: Building - Rated Assembly Fastening |
|
Tommy Matthews |
8/7/2019 |
Cancelled: Building - Above Ceiling |
|
Tommy Matthews |
8/7/2019 |
Passed: Building - Insulation |
|
Tommy Matthews |
8/12/2019 |
Passed: Electrical - Temporary Service |
|
Tommy Matthews |
8/12/2019 |
Release to power company |
|
Tommy Matthews |
8/12/2019 |
Failed: Electrical - Permanent Power |
Need To Be Lockable. |
Tommy Matthews |
10/14/2019 |
Failed: Plumbing/Gas - Tub Set/Shower Pan |
Unknown As To What This Was For. |
Tommy Matthews |
10/14/2019 |
Passed: Electrical - Permanent Power |
. Need Final Septic Inspection. Need Final Elevation Certificate. Ec Rec'd |
Tommy Matthews |
10/16/2019 |
Septic Release Inspection |
|
Health Dept |
10/22/2019 |
Release to power company |
|
Troy Crews |
10/23/2019 |
Passed: Building - Final |
|
Tommy Matthews |
11/8/2019 |