Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 559 SW MAYFAIR LN
LAKE CITY, FL 32024
Parcel #: 02911-337
Acres: 0.51
Owner: George Smith,jr.
Subdivision: May-fair
Zoning: RSF-2
Flood Zone: X
District: 3
Application #: 40865
Permit #: 000038119
Related Permit: Culvert: 000002812
Submitted: Wednesday, May 15, 2019
Issued: Wednesday, May 15, 2019
Expires: Wednesday, September 25, 2019
Completed: Wednesday, September 25, 2019
Status: Completed
Septic Release? Yes
Notes:
MFE @ 156.50' PER PLAT. STRING FRONT SETBACK FOR INSPECTION. NEED ELEVATION CONFIRMATION LETTER AT SLAB. NOC REC'D. ELEVATION LETTER REC'D AT 157.51'
Job Details
This is the construction of a SFD/UTILITY
Heated Area (Sqft) 1600.00
Total Area (Sqft) 2447.00
Stories 1
Setbacks Front 25.00
Setback Side 1 10.00
Setback Side 2 10.00
Setbacks Rear 15.00
Septic# 19-0288
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Fema map number 12023C0290D
Review Notes
Contractors
Name/ Business License Title Role
B. Trent Giebeig

CRC1330693
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway David Mccormick 5/16/2019
Passed: Building - Footer Tommy Matthews 5/20/2019
Passed: Engineering - Setbacks Tommy Matthews 5/20/2019
Failed: Electrical - Temporary Service Need Gfi Tommy Matthews 5/20/2019
Passed: Electrical - Temporary Service Tommy Matthews 5/23/2019
Release to power company Tommy Matthews 5/23/2019
Passed: Plumbing/Gas - Underground Rough-In Tommy Matthews 5/23/2019
Passed: Building - Slab Tommy Matthews 5/29/2019
Passed: Building - Ext Strapping/Wall Sheathing Tommy Matthews 6/26/2019
Passed: Electrical - Rough In Tommy Matthews 7/25/2019
Passed: Mechanical - Rough In Tommy Matthews 7/25/2019
Failed: Plumbing/Gas - Rough In Need Pressure Maintained On Supply Lines Tommy Matthews 7/25/2019
Failed: Building - Framing Need Repair From Truss Company On Truss T-12 some All Threads Are Loose Especially In Garage. Check Them All. Tommy Matthews 7/25/2019
Passed: Building - Framing Tommy Matthews 7/26/2019
Passed: Plumbing/Gas - Rough In Tommy Matthews 7/26/2019
Passed: Building - Insulation Need Elevation Confirmation Letter Before Next Inspection Tommy Matthews 8/2/2019
Septic Release Inspection Health Dept 9/3/2019
Failed: Electrical - Permanent Power Need Elevation Letter. Home Needs To Be Lockable. Wire Nuts Or Tape On Exposed Wires. Tommy Matthews 9/3/2019
Passed: Engineering - Final Driveway Mccormick, David 9/4/2019
Passed: Electrical - Permanent Power Matt Forsyth 9/5/2019
Release to power company Matt Forsyth 9/5/2019
Passed: Building - Final 9/25/2019 Rec'd, Need Blower Door Test Tommy Matthews 9/24/2019