Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
David Mccormick |
5/9/2019 |
Passed: Building - Footer |
10x20 Footer 2 # 5 Bars |
Troy Crews |
5/9/2019 |
Passed: Engineering - Setbacks |
|
Troy Crews |
5/9/2019 |
Passed: Electrical - Temporary Service |
|
Troy Crews |
5/9/2019 |
Release to power company |
|
Troy Crews |
5/9/2019 |
Passed: Engineering - Final Driveway |
|
David Mccormick |
5/15/2019 |
Passed: Plumbing/Gas - Rough In |
|
Troy Crews |
5/24/2019 |
Passed: Building - Slab |
Install Corner Crack Bars |
Troy Crews |
6/3/2019 |
Passed: Building - Roof Decking |
|
Troy Crews |
7/9/2019 |
Passed: Building - Ext Strapping/Wall Sheathing |
|
Troy Crews |
7/19/2019 |
Passed: Building - Framing |
|
Troy Crews |
7/19/2019 |
Passed: Electrical - Rough In |
|
Troy Crews |
8/13/2019 |
Passed: Mechanical - Rough In |
Ducts Hanging Below Trusses Several Locations, Also Pinch Points, Check All Over |
Troy Crews |
8/13/2019 |
Failed: Plumbing/Gas - Rough In |
Repair Drain Line 3 Inch Kitchen Area Has Hole Between Green Paint Lines |
Troy Crews |
8/13/2019 |
Failed: Mechanical - Rough In |
Ducts Hanging Below Trusses Several Areas, Also Pinch Points Several Areas, Check All Over |
Troy Crews |
8/13/2019 |
Cancelled: Electrical - Rough In |
|
Troy Crews |
8/15/2019 |
Passed: Mechanical - Rough In |
|
Troy Crews |
8/15/2019 |
Passed: Plumbing/Gas - Rough In |
Line Repaired |
Troy Crews |
8/15/2019 |
Passed: Building - Insulation |
|
Troy Crews |
8/26/2019 |
Passed: Electrical - Permanent Power |
Need Health Release |
Troy Crews |
11/20/2019 |
Passed: Engineering - Final Driveway |
|
Mccormick, David |
11/21/2019 |
Release to power company |
|
Mg |
11/27/2019 |
Septic Release Inspection |
|
Health Dept |
11/27/2019 |
Passed: Building - Final |
|
Troy Crews |
1/2/2020 |