Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 217 SW UPSTAGE GLEN
LAKE CITY, FL 32024
Parcel #: 09280-149
Acres: 4.51
Owner: James David Waller & Alica Waller
Subdivision: The Oaks Of Lake City
Zoning: PRRD
Flood Zone: X
District: 5
Application #: 40761
Permit #: 000038049
Related Permit: Culvert: 000002800
Submitted: Monday, April 29, 2019
Issued: Monday, April 29, 2019
Expires: Friday, January 31, 2020
Completed: Friday, January 31, 2020
Status: Completed
Septic Release? Yes
Notes:
MINIMUM FLOOR ELEVATION PER PLAT IS 81', NEED ELEVATON LETTER AT SLAB, NOC REC'D. ELEVATION LETTER REC'D AT 86.8'. GUEST/POOL HOUSE PERMIT 38140
Job Details
This is the construction of a SFD, UTILITY
Heated Area (Sqft) 3473.00
Total Area (Sqft) 5397.00
Stories 1
Setbacks Front 30.00
Setback Side 1 25.00
Setback Side 2 25.00
Setbacks Rear 25.00
Septic# 19-0277
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Fema map number 12023C0395C
Review Notes
Contractors
Name/ Business License Title Role
Isaiah Cully

CBC1259655
Inspections
Inspection Notes Performed By Date
Passed: Building - Footer Troy Crews 5/8/2019
Passed: Engineering - Setbacks Noc To Us In Morning Per Contractor Troy Crews 5/8/2019
Passed: Electrical - Footer Steel & Grounding Troy Crews 5/8/2019
Passed: Plumbing/Gas - Underground Rough-In Troy Crews 5/15/2019
Passed: Building - Slab Troy Crews 5/21/2019
Passed: Engineering - Initial Driveway Mccormick, David 7/8/2019
Passed: Building - Framing Draft Stop Wall Cavity Ar Vaulted Ceiling An Second Story Wall, Also Nail Off Post To Beam Front Porch Troy Crews 7/29/2019
Passed: Building - Roof Decking Troy Crews 7/29/2019
Passed: Building - Ext Strapping/Wall Sheathing Troy Crews 7/29/2019
Passed: Mechanical - Rough In Tommy Matthews 8/28/2019
Passed: Electrical - Rough In Tommy Matthews 8/28/2019
Passed: Plumbing/Gas - Rough In Tommy Matthews 8/28/2019
Passed: Building - Insulation Troy Crews 9/16/2019
Passed: Engineering - Final Driveway Mccormick, David 12/9/2019
Failed: Electrical - Permanent Power Need Garage Doors Installed And I Release The Driveway Matt Forsyth 1/23/2020
Septic Release Inspection Health Dept 1/24/2020
Passed: Electrical - Permanent Power Troy Crews 1/24/2020
Release to power company Troy Crews 1/24/2020
Passed: Building - Final Release Pending Blower Door Test, Rec'd 1/31/20 Troy Crews 1/29/2020