Inspection |
Notes |
Performed By |
Date |
Failed: Engineering - Final Driveway |
Needs To Be Transfer To A Culvert Permit. |
David Mccormick |
4/12/2019 |
Passed: Building - Footer |
Option 4used In Geo-tech Report |
Troy Crews |
4/17/2019 |
Passed: Engineering - Setbacks |
|
Troy Crews |
4/17/2019 |
Passed: Plumbing/Gas - Underground Rough-In |
Reminder Must Apply For Culvert |
Troy Crews |
4/26/2019 |
Passed: Building - Slab |
|
Troy Crews |
5/1/2019 |
Passed: Electrical - Temporary Service |
|
Troy Crews |
5/21/2019 |
Release to power company |
|
Troy Crews |
5/21/2019 |
Cancelled: Building - Framing |
|
Troy Crews |
5/24/2019 |
Cancelled: Building - Rated Assembly Fastening |
|
Troy Crews |
5/24/2019 |
Passed: Building - Roof Decking |
|
Troy Crews |
5/28/2019 |
Passed: Building - Ext Strapping/Wall Sheathing |
|
Troy Crews |
5/28/2019 |
Failed: Building - Framing |
Draft Stop Top Of Fireplace Box, Place Studs Under Double Girder Ends And Tie Downs. Call Back In With Insulation |
Troy Crews |
6/4/2019 |
Passed: Electrical - Rough In |
|
Troy Crews |
6/4/2019 |
Passed: Mechanical - Rough In |
|
Troy Crews |
6/4/2019 |
Passed: Plumbing/Gas - Rough In |
|
Troy Crews |
6/4/2019 |
Passed: Building - Framing |
Send Pictures Of Final Stud Packs |
Troy Crews |
6/7/2019 |
Passed: Building - Insulation |
|
Troy Crews |
6/7/2019 |
Septic Release Inspection |
|
Health Dept |
6/25/2019 |
Failed: Electrical - Permanent Power |
House Needs To Be Lockable. Needs Front Door. Needs Driveway Approval. Drive Approved 8/16/19
need Access To Metal Building. |
Tommy Matthews |
8/1/2019 |
Passed: Engineering - Initial Driveway |
|
Mccormick, David |
8/15/2019 |
Passed: Engineering - Final Driveway |
|
Mccormick, David |
8/16/2019 |
Passed: Electrical - Permanent Power |
|
Troy Crews |
8/19/2019 |
Release to power company |
|
Troy Crews |
8/19/2019 |
Passed: Building - Final |
|
Troy Crews |
9/5/2019 |