Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 129 SW LOTUS GLN
LAKE CITY, FL 32024
Parcel #: 02731-015
Acres: 0.35
Owner: The Preserve At Laurel Lake Inc
Subdivision: The Preserve At Laurel Lake
Zoning: PRD
Flood Zone: X
District: 3
Application #: 40481
Permit #: 000037860
Related Permit: Culvert Waiver: 000002766
Submitted: Wednesday, March 13, 2019
Issued: Wednesday, March 13, 2019
Expires: Friday, October 11, 2019
Completed: Friday, October 11, 2019
Status: Completed
Septic Release? Yes
Notes:
MINIMUM FLOOR ELEVATION PER PLAT IS 114.5', NEED ELEVATION CONFIRMATION LETTER AT SLAB NOC REC'D. REC'D ELEVATION CONFIRMATION LETTER AT 115.7'.
Job Details
This is the construction of a SFD, UTILITY
Heated Area (Sqft) 2026.00
Total Area (Sqft) 2746.00
Stories 1
Setbacks Front 25.00
Setback Side 1 10.00
Setback Side 2 10.00
Setbacks Rear 15.00
Septic# X-CITY
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Fema map number 12023C0290D
Review Notes
Contractors
Name/ Business License Title Role
Aaron Simque

County License & State License Expired.
R282811879
Inspections
Inspection Notes Performed By Date
Passed: Building - Footer Troy Crews 3/21/2019
Passed: Engineering - Setbacks Troy Crews 3/21/2019
Passed: Plumbing/Gas - Rough In Troy Crews 4/9/2019
Passed: Building - Slab Troy Crews 4/12/2019
Passed: Building - Roof Decking Troy Crews 5/7/2019
Passed: Building - Ext Strapping/Wall Sheathing Troy Crews 5/7/2019
Passed: Building - Framing Troy Crews 5/21/2019
Passed: Mechanical - Rough In Troy Crews 5/21/2019
Failed: Electrical - Rough In Need To Move Wiring Upstairs Bath Troy Crews 5/21/2019
Failed: Plumbing/Gas - Rough In Upstairs Shower Not Complete Troy Crews 5/21/2019
Failed: Building - Insulation Need To Repair Had To Remove Spots To Do Rough In, Call Back In Nosheetrock Until Approved Troy Crews 6/4/2019
Passed: Electrical - Rough In Troy Crews 6/4/2019
Passed: Plumbing/Gas - Rough In Troy Crews 6/4/2019
Passed: Mechanical - Rough In Troy Crews 6/4/2019
Failed: Building - Insulation Insulation Not Complete Do Not Sheetrock Troy Crews 6/11/2019
Passed: Building - Insulation Repaired Troy Crews 6/14/2019
Passed: Electrical - Permanent Power Troy Crews 10/1/2019
Release to power company Troy Crews 10/1/2019
Passed: Building - Final Release Pending Blower Door Test, Rec'd 10/10/19 Troy Crews 10/10/2019