Search pages and services on the county website.
Choose the colors you prefer.
Permit
811 SW CHESTERFIELD CIRCLELAKE CITY, FL 32024
No status updates yet.
Trent Giebeig
Passed: Building - Footer
Inspected by Troy Crews
Passed: Engineering - Setbacks
Passed: Electrical - Temporary Service
Release to power company
Passed: Plumbing/Gas - Underground Rough-In
Inspected by Tommy Matthews
Passed: Building - Slab
Passed: Building - Ext Strapping/Wall Sheathing
Inspected by Matt Forsyth
Passed: Building - Framing
Need Headers Nailed On Both Sides
Passed: Electrical - Rough In
Passed: Mechanical - Rough In
Exhaust Fan Loose From Duct
Passed: Plumbing/Gas - Tub Set/Shower Pan
Tub Not Trimmed Out
Passed: Plumbing/Gas - Rough In
Passed: Building - Insulation
Failed: Electrical - Permanent Power
Need Door Locks On Exterior Doors To Pass
Passed: Electrical - Permanent Power
Need Driveway(rec'd) And Septic Approval To Release Power
Inspected by Lh
Septic Release Inspection
Inspected by Health Dept
Passed: Building - Final