Permit Details

Permit Search

Permit

New Commercial Construction

2529 SW STATE RD 47, BLDG 6
LAKE CITY, FL 32025

Permit #
000037633
Application #
40135
Status Completed
  1. Submitted Jan 15, 2019
  2. Issued Jan 15, 2019
  3. Expires Oct 13, 2019
  4. Completed Apr 16, 2019

Property

Parcel #
08479-005
Owner
Mini Storage & Record Storage Of Lc
Acres
7.91
Subdivision
Building #6
Zoning
CI
Flood zone
X
District
5

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0294D
This is the construction of a:
METAL STORAGE BLDG
Driveway access to property:
Existing Drive
Is there a Fire Sprinkler System?
No
Setbacks Front
20.00
Setback Side 1
5.00
Setback Side 2
5.00
Setback Rear
15.00
Stories
1
Total Area (Sqft)
5000
Building Code Occupancy Types
Storage
Occupancy Use Title
STORAGE
Dev Permit #
F023-
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
18-0678

Status & Review History

No status updates yet.

Contractors

  • Mike Todd

    License
    CGC006209
    Title
    —
    Role
    —

Inspections

  1. Jan 16, 2019

    Septic Release Inspection

    Inspected by Health Dept

  2. Feb 1, 2019

    Passed: Engineering - Spot Check

    Co Issued For Bldg 4 & Bldg 5. Must Had Required Buffer Up And Clean Silt Out Of Retention Pond Prior To Issuance Of Certificate Of Occupancy For Building #6.

    Inspected by Laurie Hodson

  3. Mar 4, 2019

    Passed: Building - Framing

    Inspected by Troy Crews

  4. Mar 4, 2019

    Passed: Building - Insulation

    Inspected by Troy Crews

  5. Mar 29, 2019

    Failed: Building - Final

    Adjust Light Sensor To Come On Upon Entry

    Inspected by Troy Crews

  6. Mar 29, 2019

    Failed: Building - Fire Rated Wall

    Door At Firewall Not In Place

    Inspected by Troy Crews

  7. Mar 29, 2019

    Cancelled: Fire - Fire Rated Wall

    Inspected by Troy Crews

  8. Apr 10, 2019

    Passed: Building - Final

    Release Of Co Pending Fire And Site Final

    Inspected by Troy Crews

  9. Apr 10, 2019

    Passed: Fire - Fire Final

    Inspected by Tad Cervantes

  10. Apr 12, 2019

    Failed: Engineering - Zoning Final

    Remove Silt From Retention Pond, Rebuild And Stabilize Retention Pond Banks, And Make Sure Buffer Landscaping Is Maintained.

    Inspected by Brandon Stubbs

  11. Apr 16, 2019

    Passed: Engineering - Zoning Final

    Placed Erosion Control For Drainage Outlets & Banks Rebuilt, Retention Pond Cleared, Landscaping Watered.

    Inspected by Laurie Hodson