Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 290 SW FIELDSTONE COURT
LAKE CITY, FL 32024
Parcel #: 02438-161
Acres: 0.51
Owner: Mf Butler Homes Llc
Subdivision: Emerald Cove
Zoning: RSF-2
Flood Zone: X
District: 3
Application #: 40078
Permit #: 000037593
Related Permit: Culvert: 000002724
Submitted: Friday, January 4, 2019
Issued: Friday, January 4, 2019
Expires: Monday, November 11, 2019
Completed:
Status:
Septic Release? Yes
Notes:
FLOOR ONE FOOT ABOVE THE ROAD, NOC ON FILE ENGINEER LETTER REC'D FOR MINIMUM FLOOR ELEVATION TO BE 12" ABOVE THE EXISTING GROUND AT ANY POINT ALONG THE PERIMETER AND THE GROUND GRADED TO CONVEY STORMWATER RUNOFF AWAY FROM THE STRUCTURE. ELEVATION LETTER REC'D @ 1.01' ABOVE THE HIGHEST ADJACENT GRADE
Job Details
This is the construction of a SFD, UTILITY
Heated Area (Sqft) 1880.00
Total Area (Sqft) 2557.00
Stories 1
Setbacks Front 25.00
Setback Side 1 10.00
Setback Side 2 10.00
Setbacks Rear 15.00
Septic# (00-0000) or (X00-000) 18-0588
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Fema map number 12023C0290D
Review Notes
Contractors
Name/ Business License Title Role
Mark Bauer

County License & State License & Liability Insurance & Employees Workers Comp Expired.
CBC1259633
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway David Mccormick 1/7/2019
Passed: Building - Footer Troy Crews 1/9/2019
Passed: Engineering - Setbacks Troy Crews 1/9/2019
Passed: Electrical - Temporary Service Troy Crews 1/24/2019
Release to power company Troy Crews 1/24/2019
Passed: Plumbing/Gas - Underground Rough-In Troy Crews 2/1/2019
Passed: Building - Slab Troy Crews 2/6/2019
Rescheduled 2/22/2019:Building - Roof Decking Troy Crews 2/21/2019
Rescheduled 2/22/2019:Building - Ext Strapping/Wall Sheathing Troy Crews 2/21/2019
Passed: Building - Roof Decking Troy Crews 2/22/2019
Passed: Building - Ext Strapping/Wall Sheathing Troy Crews 2/22/2019
Passed: Electrical - Rough In Troy Crews 3/6/2019
Passed: Mechanical - Rough In Troy Crews 3/6/2019
Passed: Plumbing/Gas - Rough In Troy Crews 3/6/2019
Failed: Building - Framing Check Back Two Gang Window Sections Calls For 3 Jack Studs, May Need To Consult Engineer, Also Nee N.o.c. Asap, Call Back In With Insulation. Troy Crews 3/6/2019
Passed: Building - Insulation Troy Crews 3/8/2019
Passed: Building - Framing Pending Clarification From Engineer On Jack Studs Under Windows West Walll Troy Crews 3/8/2019
Passed: Electrical - Permanent Power Need Eh & Final driveway Tommy Matthews 4/25/2019
Passed: Engineering - Final Driveway David Mccormick 4/29/2019
Release to power company Rec'd Eh 04.30.19 Tm 4/30/2019
Septic Release Inspection Health Dept 5/1/2019
Passed: Building - Final Need Blower Door Test Tommy Matthews 5/15/2019