Inspection |
Notes |
Performed By |
Date |
Failed: Engineering - Final Driveway |
Needs A Culvert Permit Not A Culvert Waiver. |
David Mccormick |
12/3/2018 |
Passed: Engineering - Initial Driveway |
Waiver Converted Same Day 12/3/18 |
David Mccormick |
12/3/2018 |
Release to power company |
|
Troy Crews |
12/3/2018 |
Passed: Electrical - Temporary Service |
|
Troy Crews |
12/4/2018 |
Passed: Plumbing/Gas - Underground Rough-In |
|
Troy Crews |
12/4/2018 |
Rescheduled 12/13/2018:Building - Monolithic Slab |
Not Ready |
Laurie Hodson |
12/12/2018 |
Rescheduled 12/13/2018:Engineering - Setbacks |
Not Ready |
Laurie Hodson |
12/12/2018 |
Cancelled: Engineering - Setbacks |
|
Troy Crews |
12/12/2018 |
Passed: Engineering - Setbacks |
|
Troy Crews |
12/13/2018 |
Passed: Building - Monolithic Slab |
|
Troy Crews |
12/13/2018 |
Passed: Building - Ext Strapping/Wall Sheathing |
|
Troy Crews |
1/7/2019 |
Passed: Building - Roof Decking |
|
Troy Crews |
1/7/2019 |
Passed: Building - Framing |
|
Troy Crews |
2/15/2019 |
Passed: Electrical - Rough In |
|
Troy Crews |
2/15/2019 |
Failed: Mechanical - Rough In |
Bath Fan Ducts Pulled Loose And Drooping, Also Need To Complete Secondary Drain On Pan For Air Handler |
Troy Crews |
2/15/2019 |
Cancelled: Plumbing/Gas - Underground Rough-In |
|
Troy Crews |
2/15/2019 |
Failed: Plumbing/Gas - Rough In |
Need To Insulate Water Lines Exposed To Soffit Area ,short Pieces |
Troy Crews |
2/15/2019 |
Passed: Mechanical - Rough In |
|
Troy Crews |
2/20/2019 |
Passed: Plumbing/Gas - Rough In |
|
Troy Crews |
2/20/2019 |
Passed: Building - Insulation |
|
Troy Crews |
3/11/2019 |
Passed: Electrical - Permanent Power |
Need Septic And Driveway Release |
Matt Forsyth |
4/17/2019 |
Septic Release Inspection |
Need Driveway Final |
Health Dept |
4/29/2019 |
Passed: Engineering - Final Driveway |
|
David Mccormick |
5/2/2019 |
Release to power company |
|
Lh |
5/3/2019 |
Passed: Building - Final |
Blower Door Test Recieved |
Troy Crews |
5/31/2019 |