Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 262 SW FOREST GLN
LAKE CITY, FL 32025
Parcel #: 09116-117
Acres: 5.01
Owner: Bradley & Sandra Ward
Subdivision: Hills @ Rose Creek
Zoning: PRRD
Flood Zone: X
District: 4
Application #: 39947
Permit #: 000037505
Related Permit: Culvert: 000002711
Submitted: Monday, December 3, 2018
Issued: Monday, December 3, 2018
Expires: Monday, June 3, 2019
Completed: Monday, June 3, 2019
Status: Completed
Septic Release? Yes
Notes:
1 FOOT ABOVE ROAD. NOC ON FILE.
Job Details
This is the construction of a SFD/UTILITY
Heated Area (Sqft) 2061.00
Total Area (Sqft) 2961.00
Stories 1
Setbacks Front 30.00
Setback Side 1 25.00
Setback Side 2 25.00
Setbacks Rear 25.00
Septic# 18-0874
Power Company CLAY
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Fema map number 12023C0384D
Review Notes
Contractors
Name/ Business License Title Role
S. Van Conner

CRC057203
Inspections
Inspection Notes Performed By Date
Failed: Engineering - Final Driveway Needs A Culvert Permit Not A Culvert Waiver. David Mccormick 12/3/2018
Passed: Engineering - Initial Driveway Waiver Converted Same Day 12/3/18 David Mccormick 12/3/2018
Release to power company Troy Crews 12/3/2018
Passed: Electrical - Temporary Service Troy Crews 12/4/2018
Passed: Plumbing/Gas - Underground Rough-In Troy Crews 12/4/2018
Rescheduled 12/13/2018:Building - Monolithic Slab Not Ready Laurie Hodson 12/12/2018
Rescheduled 12/13/2018:Engineering - Setbacks Not Ready Laurie Hodson 12/12/2018
Cancelled: Engineering - Setbacks Troy Crews 12/12/2018
Passed: Engineering - Setbacks Troy Crews 12/13/2018
Passed: Building - Monolithic Slab Troy Crews 12/13/2018
Passed: Building - Ext Strapping/Wall Sheathing Troy Crews 1/7/2019
Passed: Building - Roof Decking Troy Crews 1/7/2019
Passed: Building - Framing Troy Crews 2/15/2019
Passed: Electrical - Rough In Troy Crews 2/15/2019
Failed: Mechanical - Rough In Bath Fan Ducts Pulled Loose And Drooping, Also Need To Complete Secondary Drain On Pan For Air Handler Troy Crews 2/15/2019
Cancelled: Plumbing/Gas - Underground Rough-In Troy Crews 2/15/2019
Failed: Plumbing/Gas - Rough In Need To Insulate Water Lines Exposed To Soffit Area ,short Pieces Troy Crews 2/15/2019
Passed: Mechanical - Rough In Troy Crews 2/20/2019
Passed: Plumbing/Gas - Rough In Troy Crews 2/20/2019
Passed: Building - Insulation Troy Crews 3/11/2019
Passed: Electrical - Permanent Power Need Septic And Driveway Release Matt Forsyth 4/17/2019
Septic Release Inspection Need Driveway Final Health Dept 4/29/2019
Passed: Engineering - Final Driveway David Mccormick 5/2/2019
Release to power company Lh 5/3/2019
Passed: Building - Final Blower Door Test Recieved Troy Crews 5/31/2019