Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
David Mccormick |
11/30/2018 |
Passed: Electrical - Temporary Service |
|
Troy Crews |
12/6/2018 |
Release to power company |
|
Troy Crews |
12/6/2018 |
Passed: Engineering - Setbacks |
|
Tommy Matthews |
12/12/2018 |
Failed: Building - Footer |
Need Ground Wire.
rod Chairs Need To Be Wire Or #3 Bars Horizon. See Section A/s.1
check For Clay In Se Corner Of Home. |
Tommy Matthews |
12/12/2018 |
Passed: Building - Footer |
|
Troy Crews |
12/13/2018 |
Passed: Engineering - Setbacks |
|
Troy Crews |
12/13/2018 |
Passed: Plumbing/Gas - Underground Rough-In |
|
Tommy Matthews |
1/11/2019 |
Passed: Building - Slab |
|
Troy Crews |
1/15/2019 |
Passed: Building - Ext Strapping/Wall Sheathing |
|
Tommy Matthews |
2/20/2019 |
Passed: Building - Framing |
Provide Revised Truss Drawings For Garage. Provide Adjust Ment For Header To Garage Door. |
Tommy Matthews |
7/11/2019 |
Passed: Electrical - Rough In |
|
Tommy Matthews |
7/11/2019 |
Passed: Mechanical - Rough In |
|
Tommy Matthews |
7/11/2019 |
Passed: Plumbing/Gas - Rough In |
|
Tommy Matthews |
7/11/2019 |
Failed: Building - Insulation |
No More Inspections Until Notes Are Addressed On Framing Inspection. |
Tommy Matthews |
7/19/2019 |
Passed: Building - Framing |
|
Tommy Matthews |
7/31/2019 |
Engineering-Spot Check |
Septic Permit Number Corrected - Septic Final Released On 7/7/20 - 18-0867 - Ok To Release For Power |
Laurie Hodson |
7/7/2020 |
Passed: Engineering - Final Driveway |
|
Mccormick, David |
11/30/2020 |
Passed: Electrical - Permanent Power |
Need Driveway Release To Release Permanent Power |
Matt Forsyth |
11/30/2020 |
Release to power company |
Driveway Connection Finaled On 11.30.20 |
Matt Forsyth |
12/7/2020 |
Passed: Building - Final |
Need Blower Door Test And Picture Of Notice On Panel For Air Handler In Attic |
Troy Crews |
2/17/2021 |