Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 1022 SW MARYNIK DR
HIGH SPRINGS, FL 32643
Parcel #: 10006-228
Acres: 7.10
Owner: Samantha & Fredrick Findley Iii
Subdivision: River Rise
Zoning: AG-3
Flood Zone: X
District: 4
Application #: 39918
Permit #: 000037485
Related Permit: Culvert: 000002705
Submitted: Wednesday, November 28, 2018
Issued: Wednesday, November 28, 2018
Expires: Friday, May 10, 2019
Completed: Friday, May 10, 2019
Status: Completed
Septic Release? Yes
Notes:
FLOOR ONE FOOT ABOVE THE ROAD, NOC ON FILE
Job Details
This is the construction of a SFD, UTILITY
Heated Area (Sqft) 2048.00
Total Area (Sqft) 2356.00
Stories 1
Setbacks Front 30.00
Setback Side 1 25.00
Setback Side 2 25.00
Setbacks Rear 25.00
Septic# 18-0926
Power Company CLAY
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Fema map number 12023C0513C
Review Notes
Contractors
Name/ Business License Title Role
Adam Papka

County License & State License & Liability Insurance & Workers Comp Expired.
CBC1253409
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway David Mccormick 11/29/2018
Failed: Electrical - Temporary Service Pole Not Set Troy Crews 11/29/2018
Passed: Plumbing/Gas - Underground Rough-In Troy Crews 11/29/2018
Release to power company Troy Crews 12/6/2018
Passed: Electrical - Temporary Service Troy Crews 12/10/2018
Passed: Building - Slab Troy Crews 12/10/2018
Passed: Building - Roof Decking Troy Crews 12/31/2018
Passed: Building - Ext Strapping/Wall Sheathing Troy Crews 12/31/2018
Passed: Building - Framing Troy Crews 1/14/2019
Passed: Electrical - Rough In Troy Crews 1/14/2019
Passed: Mechanical - Rough In Troy Crews 1/14/2019
Passed: Plumbing/Gas - Rough In Troy Crews 1/14/2019
Passed: Building - Insulation Troy Crews 1/15/2019
Failed: Electrical - Permanent Power House Needs To Be Lockable. Tommy Matthews 3/15/2019
Passed: Electrical - Permanent Power Door Locks Installed Needs Final Septic And Driveway Troy Crews 3/21/2019
Septic Release Inspection Health Dept 4/16/2019
Release to power company Eh Rec'd Troy Crews 4/18/2019
Passed: Engineering - Final Driveway David Mccormick 5/9/2019
Passed: Building - Final Release Pending Blower Door. Rec'd 5/10/19 Troy Crews 5/9/2019
Documents
File Name Date File Size
Permit-000037485.pdf 2023.12.26 48.21kB