Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Mobile Home Permit

Address 853 SW BARON GLEN FORT WHITE FL 32038
Parcel #: 03752-412
Acres: 4.78
Owner: Bullard-denune/jose Diaz
Subdivision: Southern Meadows
Zoning: AG-3
Flood Zone: X
District:
Application #: 39898
Permit #: 000037475
Related Permit:
Submitted: Monday, November 26, 2018
Issued: Monday, November 26, 2018
Expires: Friday, February 8, 2019
Completed: Friday, February 8, 2019
Status: Completed
Septic Release? Yes
Notes:
PLAT RQUIRES MINIMUM FLOOR ELEVATION OF 88', NEED ELEVATION CONFIRMATION LETTER BEFORE POWER, elevation letter rec'd at 90.40'
Job Details
Finished floor requirement
Mobile Home is a: Double Wide
Year Built 2019
Width (Ft.In) 32
Length (Ft.In) 48
Driveway access to home: Private Drive
Acres Dedicated To Each Home: 4.78
Installation Decal # 53817
Special temporary use permit number: CLAY
Septic # (00-0000) or (X00-000) 18-0474
Setbacks Front 30.00
Setback Side 1 25.00
Setbacks Rear 25.00
Dev Permit # F023-
Are you applying for a 5 year temporary permit? No
Serial # FL261-OGPHA102887AB
Wind Zone? 2
Review Notes
Contractors
Name/ Business License Title Role
Robert Sheppard

IH1025386
Inspections
Inspection Notes Performed By Date
Failed: Mobile Home - Mobile Home Set-Up Final Bond Wire Not Installed. no Access To Home. plumbing Not Complete To Septic Tank. Tommy Matthews 1/29/2019
Passed: Engineering - Setbacks Tommy Matthews 1/29/2019
Passed: Mobile Home - Mobile Home Set-Up Final Tommy Matthews 2/4/2019
Release to power company Laurie Hodson 2/8/2019
Septic Release Inspection Health Dept 2/8/2019
Documents