Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
David Mccormick |
10/22/2018 |
Passed: Building - Footer |
Reminder 1 Ft Above Rd. 12/5/18 Elevation Letter Rec'd |
Troy Crews |
11/29/2018 |
Passed: Engineering - Setbacks |
|
Troy Crews |
11/29/2018 |
Passed: Electrical - Temporary Service |
|
Troy Crews |
12/7/2018 |
Release to power company |
|
Troy Crews |
12/7/2018 |
Passed: Plumbing/Gas - Underground Rough-In |
|
Troy Crews |
12/17/2018 |
Passed: Building - Slab |
|
Troy Crews |
12/18/2018 |
Passed: Building - Ext Strapping/Wall Sheathing |
|
Tommy Matthews |
2/11/2019 |
Failed: Building - Roof Decking |
This Was A Partial. Call For Another Inspection When Decking Complete. Ok To Cover Up What Is Done So Far. |
Tommy Matthews |
2/11/2019 |
Passed: Building - Roof Decking |
|
Troy Crews |
2/18/2019 |
Failed: Building - Framing |
Stud Pack All Double Girders, Uplift On C 01 And G01 Trusses |
Troy Crews |
3/12/2019 |
Failed: Electrical - Rough In |
Nw Bathroom Move Receptacle To Middle Of Double Vanity Or Add One |
Troy Crews |
3/12/2019 |
Passed: Mechanical - Rough In |
|
Troy Crews |
3/12/2019 |
Passed: Plumbing/Gas - Rough In |
|
Troy Crews |
3/12/2019 |
Passed: Building - Framing |
Items Corrected |
Troy Crews |
3/15/2019 |
Passed: Building - Insulation |
|
Troy Crews |
3/15/2019 |
Passed: Electrical - Rough In |
|
Troy Crews |
3/15/2019 |
Passed: Engineering - Final Driveway |
|
David Mccormick |
5/15/2019 |
Failed: Electrical - Permanent Power |
Electrical Panel In Garage Not Complete And Safe. |
Tommy Matthews |
5/22/2019 |
Passed: Electrical - Permanent Power |
|
Tommy Matthews |
5/23/2019 |
Release to power company |
|
Lh |
5/28/2019 |
Septic Release Inspection |
|
Health Dept |
5/28/2019 |
Failed: Building - Final |
Need Blower Door Test.
4 Gfi Outlets In Garage Don’t Work
1 Outlet In Bathroom Has Open Ground |
Tommy Matthews |
6/25/2019 |
Passed: Building - Final |
|
Tommy Matthews |
6/26/2019 |