Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Commercial Construction Permit
Address 14143 SOUTH US HWY 441 LAKE CITY FL 32024
Parcel #: 09590-001
Acres: 0.83
Owner: 2511 Howell, Llc
Subdivision:
Zoning: CHI
Flood Zone: X
District: 4
Application #: 39655
Permit #: 000037278
Related Permit:
Submitted: Monday, October 1, 2018
Issued: Monday, October 1, 2018
Expires: Friday, March 1, 2019
Completed: Friday, March 1, 2019
Status: Completed
Septic Release? Yes
Notes:
MINIMUM FLOOR ELEVATION SET AT 83.6', NEED ELEVATION CONFIRMATION LETTER AT SLAB ELEVATION SURVEY REC'D WITH SLAB AT 83.65'. DOT APPROVAL REC'D 3/1/19. SDP 1808 APPROVED 9/20/18, NOC REC'D
Job Details
This is the construction of a: DUNKIN DONUTS REST
Heated Area (Sqft) 1325.00
Total Area (Sqft) 1460.00
Total Estimated Cost 400000.00
Stories 1
Select access to property: D.O.T. Permit
Fire sprinklers? No
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Mercantile
Occupancy Use Title RESTAURANT
Design Occupant Load 38
Setbacks Front 20.00
Setback Side 1 5.00
Setback Side 2 5.00
Setback Rear 15.00
Septic# X-COUNTY
Dev Permit # F023-
Power Company CLAY
Building Code Edition Florida Building Code 2014 5th Edition & 2011 National Electrical Code
Fema map number 12023C0505C
Review Notes
Contractors
Name/ Business License Title Role
Ashley Rumble

County License & State License & Liability Insurance & Workers Comp & Employees Workers Comp Expired.
CBC1257461
Inspections
Inspection Notes Performed By Date
Passed: Plumbing/Gas - Underground Rough-In Troy Crews 10/25/2018
Passed: Electrical - Underground Rough-In Under Ground Pvc Troy Crews 10/30/2018
Passed: Building - Slab Mono Troy Crews 11/2/2018
Release to power company Troy Crews 11/26/2018
Passed: Electrical - Temporary Service Troy Crews 11/27/2018
Passed: Electrical - Underground Rough-In Secondary Conduits To Building Troy Crews 11/29/2018
Passed: Plumbing/Gas - Rough In 2nd Rough Troy Crews 12/6/2018
Passed: Building - Roof Decking Troy Crews 12/6/2018
Passed: Building - Ext Strapping/Wall Sheathing Troy Crews 12/6/2018
Cancelled: Plumbing/Gas - Rough In Troy Crews 12/10/2018
Passed: Electrical - Rough In Troy Crews 12/12/2018
Failed: Building - Framing No One On Site ,no Complete Plans, Also Need Elevation Letter From Surveyor Prior To Any Further Inspections. 12-27-18 Elevation Survey Rec'd. Troy Crews 12/20/2018
Passed: Building - Framing Troy Crews 1/3/2019
Passed: Building - Lath/Stucco Troy Crews 1/4/2019
Passed: Building - Insulation Troy Crews 1/10/2019
Passed: Mechanical - Rough In Duct Rough In For Rooftop Units Troy Crews 1/10/2019
Rescheduled 1/24/2019:Electrical - Permanent Power Troy Crews 1/23/2019
Failed: Electrical - Permanent Power Need All Door Locks And D.o.t Approval Troy Crews 1/24/2019
Passed: Electrical - Permanent Power D.o.t Approval Required Prior To C.o. Troy Crews 1/31/2019
Release to power company Troy Crews 1/31/2019
Cancelled: Re-Roof - Final Troy Crews 2/12/2019
Passed: Building - Above Ceiling Troy Crews 2/13/2019
Passed: Electrical - Above Ceiling Troy Crews 2/13/2019
Passed: Mechanical - Above Ceiling Troy Crews 2/13/2019
Cancelled: Building - Above Ceiling Troy Crews 2/15/2019
Cancelled: Electrical - Above Ceiling Troy Crews 2/15/2019
Cancelled: Mechanical - Above Ceiling Troy Crews 2/15/2019
Cancelled: Electrical - Above Ceiling Troy Crews 2/18/2019
Cancelled: Electrical - Permanent Power Troy Crews 2/18/2019
Cancelled: Electrical - Service Upgrade Final Troy Crews 2/18/2019
Passed: Building - Final Need Site Final And Fire Final For C.o. Troy Crews 2/19/2019
Passed: Fire - Fire Final They Passed The Life Safety Inspection With Exception Of The Extinguishers Haven't Been Installed. They Should Be In The Next Couple Of Days. I Will Revisit The Site Next Week. Tad Cervantes 2/21/2019
Failed: Engineering - Zoning Final Required Fencing Around Retention Pond Was Not Installed. Brandon Stubbs 2/25/2019
Passed: Engineering - Zoning Final Brandon Stubbs 3/1/2019
Documents
File Name Date File Size
Permit-000037278.pdf 2023.12.26 45.43kB
37278 Survey 2018-12-28 09.11.55.364.pdf 2023.12.26 10.74MB
Noc 2018-12-17 9.58.59 Am.pdf 2023.12.26 114.25kB