Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 306 SW WOODLEAF COURT LAKE CITY FL 32024
Parcel #: 02438-135
Acres: 0.51
Owner: Mf Butler Homes,llc
Subdivision: Emerald Cove
Zoning: RSF-2
Flood Zone: X
District: 3
Application #: 39592
Permit #: 000037255
Related Permit: Culvert Waiver: 000002680
Submitted: Wednesday, September 26, 2018
Issued: Wednesday, September 26, 2018
Expires: Wednesday, January 30, 2019
Completed: Wednesday, January 30, 2019
Status: Completed
Septic Release? Yes
Notes:
1 FOOT ABOVE ROAD. 9/27/18-REC'D ENGINEER FINISHED FLOOR SHALL BE 12 INCHES ABOVE EXISTING GROUND AT ANY POINT ALONG THE PERIMETER OF THE PROPOSED STRUCTURE. NOC ON FILE
Job Details
Finished floor requirement
Fema map number 12023C0290D
This is the construction of a SFD/UTILITY
Setbacks Front 25.00
Setback Side 1 10.00
Setback Side 2 10.00
Setbacks Rear 15.00
Stories 1
Heated Area (Sqft) 1840.00
Total Area (Sqft) 2715.00
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Septic# (00-0000) or (X00-000) 18-0585
Review Notes
Contractors
Name/ Business License Title Role
Mark Bauer

CBC1259633
Inspections
Inspection Notes Performed By Date
Passed: Building - Footer Tommy Matthews 10/5/2018
Passed: Engineering - Setbacks Tommy Matthews 10/5/2018
Release to power company Troy Crews 10/19/2018
Passed: Electrical - Temporary Service Troy Crews 10/22/2018
Passed: Plumbing/Gas - Underground Rough-In 100 Psi Troy Crews 10/22/2018
Passed: Building - Slab Contractor Uses Bait System Termite Treatment Troy Crews 10/23/2018
Passed: Building - Roof Decking Tommy Matthews 11/19/2018
Passed: Building - Ext Strapping/Wall Sheathing Tommy Matthews 11/19/2018
Failed: Building - Framing Missed All Thread Green Paint By Rear Door To Right Troy Crews 11/30/2018
Passed: Electrical - Rough In Troy Crews 11/30/2018
Passed: Mechanical - Rough In Troy Crews 11/30/2018
Failed: Plumbing/Gas - Rough In Needs Pressure On Water Lines Troy Crews 11/30/2018
Passed: Building - Framing Troy Crews 12/7/2018
Passed: Building - Insulation Troy Crews 12/7/2018
Passed: Plumbing/Gas - Rough In Troy Crews 12/7/2018
Passed: Electrical - Permanent Power Troy Crews 1/8/2019
Release to power company Laurie Hodson 1/9/2019
Septic Release Inspection Health Dept 1/9/2019
Passed: Building - Final Blower Door Test Recieved Troy Crews 1/28/2019