Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 214 SW CAMPHOR CT
LAKE CITY, FL 32055
Parcel #: 02732-306
Acres: 0.75
Owner: Cody Barrs
Subdivision: Laurel Lakes (& N.25 Ac Of Lot 7)
Zoning: RSF-2
Flood Zone: X
District: 3
Application #: 39573
Permit #: 000037236
Related Permit: Culvert: 000002677
Submitted: Friday, September 21, 2018
Issued: Friday, September 21, 2018
Expires: Tuesday, December 24, 2019
Completed:
Status:
Septic Release? Yes
Notes:
LOT 6 & N.25 AC OF LOT 7 COMBINED, NOC ON FILE MINIMUM FLOOR ELEVATION PER PLAT IS 114' AND 1' ABOVE HIGHEST ADJACENT GRADE, NEED MFE CONFIRMATION LETTER AT SLAB, ELEVATION LETTER REC'D AT 149.2' AND ALSO 1 FT. ABOVE HIGHEST ADJACENT GRADE
Job Details
This is the construction of a SFD, UTILITY
Heated Area (Sqft) 1952.00
Total Area (Sqft) 2738.00
Stories 1
Setbacks Front 25.00
Setback Side 1 10.00
Setback Side 2 10.00
Setbacks Rear 15.00
Septic# X-CITY
Power Company FPL
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Fema map number 12023C0290D
Review Notes
Contractors
Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway David Mccormick 9/25/2018
Passed: Building - Footer Troy Crews 10/9/2018
Passed: Engineering - Setbacks Troy Crews 10/9/2018
Passed: Plumbing/Gas - Rough In Troy Crews 10/22/2018
Passed: Building - Slab Troy Crews 10/25/2018
Release to power company Troy Crews 10/25/2018
Passed: Electrical - Temporary Service Troy Crews 10/26/2018
Passed: Building - Framing Check Anchor Bolts At Splices In Base Plates. Check Anchors At Garage Door Sides. Tommy Matthews 12/19/2018
Passed: Electrical - Rough In Troy Crews 1/22/2019
Passed: Mechanical - Rough In Troy Crews 1/22/2019
Passed: Plumbing/Gas - Rough In Troy Crews 1/22/2019
Passed: Building - Insulation Troy Crews 1/22/2019
Passed: Engineering - Final Driveway David Mccormick 4/2/2019
Passed: Electrical - Permanent Power Troy Crews 4/3/2019
Release to power company Termite Cert Rec'd Troy Crews 4/3/2019
Passed: Building - Final Need Blower Door Test, Rec'd Tommy Matthews 6/27/2019