Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 1125 SW MAPLETON ST
FORT WHITE, FL 32038
Parcel #: 10058-652
Acres: 1.43
Owner: Matt & Chereene Haywood
Subdivision: Santa Fe River Plantation - Replat
Zoning: AG-3
Flood Zone: X
District: 2
Application #: 39556
Permit #: 000037232
Related Permit: Culvert Waiver: 000002676
Submitted: Wednesday, September 19, 2018
Issued: Wednesday, September 19, 2018
Expires: Friday, November 22, 2019
Completed: Friday, November 22, 2019
Status: Completed
Septic Release? Yes
Notes:
MINIMUM ELEVATION PER PLAT IS 46', NEED ELEVATION CONFIRMATION LETTER AT SLAB, PLAT REQUIRES 50' SETBACKS ON ALL SIDES NOC REC'D. FRAMING ADDENDUM IN FILE
Job Details
This is the construction of a SFD, UTILITY
Heated Area (Sqft) 2030.00
Total Area (Sqft) 2288.00
Stories 1
Setbacks Front 50.00
Setback Side 1 50.00
Setback Side 2 50.00
Setbacks Rear 50.00
Septic# 18-0767
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Fema map number 12023C0534C
Review Notes
Contractors
Name/ Business License Title Role
Isaiah Cully

CBC1259655
Inspections
Inspection Notes Performed By Date
Release to power company Corrected Power Company To Duke Laurie Hodson 10/15/2018
Passed: Electrical - Temporary Service Tommy Matthews 10/15/2018
Release to power company Tommy Matthews 10/15/2018
Passed: Building - Footer Troy Crews 10/26/2018
Passed: Engineering - Setbacks Troy Crews 10/26/2018
Passed: Electrical - Footer Steel & Grounding Troy Crews 10/26/2018
Passed: Plumbing/Gas - Underground Rough-In House Waste Lines Troy Crews 11/16/2018
Passed: Building - Slab Troy Crews 11/20/2018
Passed: Plumbing/Gas - Underground Rough-In One 2 Inch Drain Line Troy Crews 11/21/2018
Passed: Building - Roof Decking Tommy Matthews 1/17/2019
Passed: Building - Ext Strapping/Wall Sheathing Tommy Matthews 1/17/2019
Passed: Building - Framing Tommy Matthews 2/15/2019
Passed: Electrical - Rough In Troy Crews 3/13/2019
Passed: Mechanical - Rough In Troy Crews 3/13/2019
Passed: Plumbing/Gas - Rough In Double Check Water Line Pressure Troy Crews 3/13/2019
Passed: Building - Insulation Troy Crews 3/21/2019
Septic Release Inspection Health Dept 3/25/2019
Passed: Electrical - Permanent Power Need Elevation Letter, Did Not Release Power Tommy Matthews 9/18/2019
Failed: Building - Final Need Call About 2 Gfi Not Working Tommy Matthews 10/23/2019
Passed: Building - Final Tommy Matthews 10/25/2019
Documents
File Name Date File Size
Permit-000037232.pdf 2023.12.26 31.48kB
Certificate Of Occupancy 20191122.pdf 2023.12.26 52.08kB