Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 944 NW ZACK DR LAKE CITY FL 32055
Parcel #: 02372-626
Acres: 0.51
Owner: Art Mcquillan
Subdivision: Arbor Green @ Emerald Lakes
Zoning: RSF-2
Flood Zone: X
District:
Application #: 39352
Permit #: 000037102
Related Permit: Culvert: 000002661
Submitted: Friday, August 17, 2018
Issued: Friday, August 17, 2018
Expires: Thursday, February 28, 2019
Completed: Thursday, February 28, 2019
Status: Completed
Septic Release? Yes
Notes:
1 FOOT ABOVE ROAD. NOC ON FILE. Blower door test recieved 5.05
Job Details
This is the construction of a SFD/UTILITY
Heated Area (Sqft) 1741.00
Total Area (Sqft) 2518.00
Stories 1
Setbacks Front 25.00
Setback Side 1 10.00
Setback Side 2 10.00
Setbacks Rear 15.00
Septic# 18-0603
Power Company Florida Power and Light
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Review Notes
Contractors
Name/ Business License Title Role
Kevin L. Bedenbaugh, Jr.

CGC1516042
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway David Mccormick 8/20/2018
Passed: Building - Footer Tommy Matthews 8/28/2018
Passed: Engineering - Setbacks Tommy Matthews 8/28/2018
Passed: Building - Slab Tommy Matthews 9/20/2018
Passed: Electrical - Temporary Service Tommy Matthews 10/3/2018
Release to power company Tommy Matthews 10/3/2018
Failed: Building - Ext Strapping/Wall Sheathing Check Spacing On Nail Pattern Troy Crews 10/9/2018
Passed: Building - Roof Decking Troy Crews 10/9/2018
Passed: Building - Ext Strapping/Wall Sheathing Re-nailed Troy Crews 10/10/2018
Passed: Building - Framing Troy Crews 10/24/2018
Passed: Electrical - Rough In Troy Crews 10/24/2018
Passed: Mechanical - Rough In Troy Crews 10/24/2018
Failed: Plumbing/Gas - Rough In Not Complete Troy Crews 10/24/2018
Passed: Plumbing/Gas - Rough In Troy Crews 10/29/2018
Passed: Building - Insulation Check On Dryer Vent Troy Crews 11/5/2018
Passed: Electrical - Permanent Power Need Health And Driveway. Drive Rec'd 1/24/19 Troy Crews 1/18/2019
Release to power company Laurie Hodson 1/24/2019
Passed: Engineering - Final Driveway David Mccormick 1/24/2019
Septic Release Inspection Health Dept 1/24/2019
Passed: Building - Final Troy Crews 2/25/2019
Documents
File Name Date File Size
D78c8136-b988-4bcf-a704-5655827f0ac2 2019-02-21 16.35.12.315.png 2023.12.26 3.04MB
Permit-000037102.pdf 2023.12.26 31.54kB