Permit Details

Permit Search

Permit

New Residential Construction

14158 SW TUSTENUGGE AVE FT. WHITE FL 32038

Permit #
000037099
Application #
39345
Status Completed
  1. Submitted Aug 15, 2018
  2. Issued Aug 15, 2018
  3. Expires Sep 22, 2019
  4. Completed Mar 27, 2019

Property

Parcel #
09814-009
Owner
Frank & Paola Gall
Acres
10.35
Subdivision
Tustenuggee Acres
Zoning
AG-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Not yet released
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0485C
This is the construction of a
SFD,UTILITY
Setbacks Front
30.00
Setback Side 1
25.00
Setback Side 2
25.00
Setbacks Rear
25.00
Stories
1
Heated Area (Sqft)
2055.00
Total Area (Sqft)
3441.00
Building Code Edition
Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Septic# (00-0000) or (X00-000)
18-0646

Status & Review History

No status updates yet.

Contractors

  • Bryan Zecher

    License
    CBC054575
    Title
    —
    Role
    —

Inspections

  1. Aug 31, 2018

    Passed: Building - Footer

    Inspected by Tommy Matthews

  2. Aug 31, 2018

    Passed: Engineering - Setbacks

    Inspected by Tommy Matthews

  3. Sep 24, 2018

    Passed: Plumbing/Gas - Rough In

    Inspected by Randy Jones

  4. Sep 26, 2018

    Passed: Building - Slab

    Inspected by Troy Crews

  5. Nov 7, 2018

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Troy Crews

  6. Nov 29, 2018

    Failed: Building - Framing

    Washers At Anchor Bolts Not Correct. shear Walls Not Installed For Interior. stud Packs Not Installed. next Time Do Not Cover Outside Straps, Beams, Etc. Before Inspection.

    Inspected by Tommy Matthews

  7. Nov 29, 2018

    Passed: Electrical - Rough In

    Inspected by Tommy Matthews

  8. Nov 29, 2018

    Passed: Mechanical - Rough In

    Inspected by Tommy Matthews

  9. Nov 29, 2018

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    Inspected by Tommy Matthews

  10. Nov 29, 2018

    Failed: Plumbing/Gas - Rough In

    Gas Lines Not Installed.

    Inspected by Tommy Matthews

  11. Dec 4, 2018

    Passed: Building - Framing

    Inspected by Tommy Matthews

  12. Dec 4, 2018

    Passed: Plumbing/Gas - Rough In

    Inspected by Tommy Matthews

  13. Dec 7, 2018

    Passed: Building - Insulation

    Inspected by Troy Crews

  14. Jan 31, 2019

    Passed: Electrical - Temporary Service

    Will Be Called In As Final Later

    Inspected by Troy Crews

  15. Jan 31, 2019

    Release to power company

    Inspected by Troy Crews

  16. Mar 26, 2019

    Passed: Building - Final

    Inspected by Troy Crews