Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 766 SW MARION MANN TERRACE
LAKE CITY, FL 32024
Parcel #: 09622-002
Acres: 50.00
Owner: Damon Stone
Subdivision:
Zoning: A-3
Flood Zone: X
District: 4
Application #: 39119
Permit #: 000036991
Related Permit:
Submitted: Thursday, July 19, 2018
Issued: Thursday, July 19, 2018
Expires: Friday, May 10, 2019
Completed: Friday, May 10, 2019
Status: Completed
Septic Release? Yes
Notes:
1 FOOT ABOVE ROAD. NOC ON FILE. BLOWER DOOR TEST RECIEVED
Job Details
This is the construction of a SFD/UTILITY
Heated Area (Sqft) 4260.00
Total Area (Sqft) 9820.00
Stories 1
Setbacks Front 30.00
Setback Side 1 25.00
Setback Side 2 25.00
Setbacks Rear 25.00
Septic# 18-0648
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Fema map number 12023C0485C
Review Notes
Contractors
Name/ Business License Title Role
Matthew Hentzelman

County License & State License Expired.
CGC1514780
Inspections
Inspection Notes Performed By Date
Passed: Building - Footer Does Not Include Interior Pads Troy Crews 8/9/2018
Passed: Engineering - Setbacks Troy Crews 8/9/2018
Passed: Electrical - Underground Rough-In Troy Crews 8/29/2018
Passed: Plumbing/Gas - Underground Rough-In Troy Crews 8/29/2018
Passed: Building - Slab Troy Crews 9/11/2018
Passed: Building - Lintel/Tie Beam Troy Crews 9/26/2018
Passed: Building - Masonry Wall Reinforcing Troy Crews 9/26/2018
Passed: Building - Footer Troy Crews 9/27/2018
Passed: Engineering - Setbacks Troy Crews 9/27/2018
Passed: Plumbing/Gas - Underground Rough-In North End Suite Troy Crews 10/4/2018
Passed: Building - Slab Troy Crews 10/12/2018
Failed: Building - Roof Decking Drive Down High Nails Remove Shiners (multiple Areas) Troy Crews 10/22/2018
Passed: Building - Roof Decking Troy Crews 10/23/2018
Passed: Building - Roof Decking Roof And Walls North Suite Troy Crews 10/31/2018
Passed: Building - Ext Strapping/Wall Sheathing Done 10:31 Troy Crews 11/1/2018
Failed: Building - Framing Need Drawing For Attic Storage Roof Build Over, Ridge And Rafter Attachments Troy Crews 12/13/2018
Passed: Building - Framing Main House Troy Crews 12/20/2018
Passed: Electrical - Rough In Main House Troy Crews 12/20/2018
Passed: Mechanical - Rough In Main House Troy Crews 12/20/2018
Passed: Plumbing/Gas - Rough In Main House Troy Crews 12/20/2018
Failed: Building - Framing All Threads Not Complete. See Circles Of Missing On Plans Tommy Matthews 12/26/2018
Failed: Electrical - Rough In Conduit Above Panel Limited To 2’ Unless Calculations Are Provided. Tommy Matthews 12/26/2018
Failed: Mechanical - Rough In Not Complete Tommy Matthews 12/26/2018
Passed: Plumbing/Gas - Rough In Tommy Matthews 12/26/2018
Cancelled: Building - Framing Randy Jones 12/27/2018
Cancelled: Electrical - Rough In Randy Jones 12/27/2018
Cancelled: Mechanical - Rough In Randy Jones 12/27/2018
Cancelled: Plumbing/Gas - Rough In Randy Jones 12/27/2018
Passed: Building - Insulation Randy Jones 12/27/2018
Passed: Building - Framing Troy Crews 1/3/2019
Passed: Electrical - Rough In Split Pipe To Less Than Two Feet Troy Crews 1/3/2019
Passed: Mechanical - Rough In Completed Troy Crews 1/3/2019
Passed: Building - Insulation Troy Crews 1/7/2019
Passed: Building - Lath/Stucco Troy Crews 1/28/2019
Passed: Electrical - Permanent Power Existing Drive Need Health Release Troy Crews 3/22/2019
Release to power company Laurie Hodson 3/25/2019
Septic Release Inspection Health Dept 3/25/2019
Rescheduled 4/12/2019:Building - Final Janice Williams 4/10/2019
Failed: Building - Final Main House Not Complete North Suite Ok For Occupancy Temporarily Until Full C.o. Troy Crews 4/12/2019
Passed: Building - Final Co Release Pending Soffit Completion Troy Crews 5/1/2019