Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
David Mccormick |
7/16/2018 |
Passed: Building - Footer |
|
Troy Crews |
10/8/2018 |
Passed: Engineering - Setbacks |
|
Troy Crews |
10/8/2018 |
Passed: Electrical - Temporary Service |
|
Tommy Matthews |
11/8/2018 |
Release to power company |
|
Tommy Matthews |
11/8/2018 |
Passed: Plumbing/Gas - Rough In |
|
Troy Crews |
11/9/2018 |
Passed: Building - Slab |
|
Troy Crews |
11/14/2018 |
Passed: Building - Ext Strapping/Wall Sheathing |
|
Tommy Matthews |
1/11/2019 |
Passed: Plumbing/Gas - Rough In |
|
Tommy Matthews |
2/12/2019 |
Passed: Electrical - Rough In |
|
Troy Crews |
2/28/2019 |
Passed: Building - Framing |
Add Screws To Floor Trusses At Bearing Points |
Troy Crews |
3/1/2019 |
Passed: Building - Insulation |
|
Matt Forsyth |
3/11/2019 |
Failed: Electrical - Permanent Power |
Need Service Entrance For Meter Can. Need Garage Doors And Locks On All Exterior Doors. Exterior Bath Room Needs Fixtures Or Safety Wire Nuts On Electrical Wires. |
Tommy Matthews |
4/29/2019 |
Rescheduled 5/7/2019:Electrical - Permanent Power |
|
Matt Forsyth |
5/7/2019 |
Failed: Electrical - Permanent Power |
No Pipe To Service Entrance |
Matt Forsyth |
5/7/2019 |
Passed: Electrical - Permanent Power |
|
Matt Forsyth |
5/10/2019 |
Release to power company |
|
Matt Forsyth |
5/10/2019 |
Septic Release Inspection |
Need Culvert Release Before Co |
Health Dept |
5/17/2019 |
Failed: Building - Final |
Blower Door Test, Laundry Gfci ,and Termite Sticker ,lighting Outlit Install Back Stoup |
Matt Forsyth |
6/19/2019 |
Passed: Building - Final |
|
Matt Forsyth |
6/24/2019 |
Passed: Building - Slab |
|
Matt Forsyth |
6/24/2019 |
Release to power company |
|
Matt Forsyth |
6/24/2019 |