Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
David Mccormick |
7/16/2018 |
Passed: Building - Footer |
|
Troy Crews |
7/18/2018 |
Passed: Engineering - Setbacks |
|
Troy Crews |
7/18/2018 |
Passed: Electrical - Temporary Service |
|
Tommy Matthews |
8/21/2018 |
Release to power company |
|
Tommy Matthews |
8/21/2018 |
Passed: Plumbing/Gas - Underground Rough-In |
|
Tommy Matthews |
8/21/2018 |
Passed: Building - Slab |
|
Troy Crews |
9/27/2018 |
Failed: Building - Ext Strapping/Wall Sheathing |
Nailing Is Required To Be 4” In All Locations. It Is Not Consistently 4” As Required. |
Tommy Matthews |
11/8/2018 |
Passed: Building - Ext Strapping/Wall Sheathing |
|
Randy Jones |
11/13/2018 |
Cancelled: Building - Ext Strapping/Wall Sheathing |
|
Troy Crews |
1/9/2019 |
Passed: Building - Framing |
|
Troy Crews |
1/9/2019 |
Passed: Electrical - Rough In |
|
Troy Crews |
1/9/2019 |
Passed: Mechanical - Rough In |
|
Troy Crews |
1/9/2019 |
Passed: Plumbing/Gas - Rough In |
|
Troy Crews |
1/9/2019 |
Failed: Building - Insulation |
Wall Between Garage And Heated Area Is Not Insulated As Required |
Tommy Matthews |
1/16/2019 |
Passed: Building - Insulation |
|
Tommy Matthews |
1/17/2019 |
Failed: Electrical - Permanent Power |
Need Garage Doors ,door Locks, Final Septic, Final Driveway |
Troy Crews |
3/5/2019 |
Septic Release Inspection |
|
Health Dept |
3/19/2019 |
Passed: Electrical - Permanent Power |
Need Driveway Final |
Troy Crews |
3/20/2019 |
Passed: Engineering - Final Driveway |
|
David Mccormick |
3/21/2019 |
Release to power company |
Lh |
|
3/25/2019 |
Passed: Building - Final |
Need Termite, Blower Door Test Results Rec'd - 3.88 |
Tommy Matthews |
4/9/2019 |