Status Completed
  1. Submitted Jun 21, 2018
  2. Issued Dec 10, 2019
  3. Expires Jun 8, 2020
  4. Completed Dec 12, 2019

Property

Parcel #
02731-011
Owner
The Preserve At Laurel Lakes
Acres
0.41
Subdivision
The Preserve @ Laurel Lake
Zoning
PRD
Flood zone
X
District
3

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0290D
This is the construction of a
SFD/UTILITY
Setbacks Front
25.00
Setback Side 1
10.00
Setback Side 2
10.00
Setbacks Rear
15.00
Stories
2
Heated Area (Sqft)
3119.00
Total Area (Sqft)
4334.00
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
SINGLE FAMILY DWELLING
Building Code Edition
Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Septic# (00-0000) or (X00-000)
X-CITY

Status & Review History

  1. Permit Renewed

Contractors

  • Aaron Simque

    License
    R282811879
    Title
    —
    Role
    —

    County License & State License & Liability Insurance & Workers Comp Expired.

Inspections

  1. Jul 9, 2018

    Failed: Building - Footer

    Need To Pull Strings Verify 25 Ft. Setback Two Fronts

    Inspected by Troy Crews

  2. Jul 9, 2018

    Failed: Engineering - Setbacks

    Verify Setback

    Inspected by Troy Crews

  3. Jul 9, 2018

    Passed: Building - Footer

    Strings Pulled And Verified

    Inspected by Troy Crews

  4. Jul 9, 2018

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  5. Jul 19, 2018

    Passed: Plumbing/Gas - Underground Rough-In

    Inspected by Troy Crews

  6. Jul 26, 2018

    Passed: Building - Slab

    Inspected by Tommy Matthews

  7. Aug 8, 2018

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Troy Crews

  8. Aug 16, 2018

    Passed: Building - Roof Decking

    Inspected by Troy Crews

  9. Sep 21, 2018

    Passed: Building - Framing

    Inspected by Troy Crews

  10. Sep 21, 2018

    Passed: Electrical - Rough In

    Inspected by Troy Crews

  11. Sep 21, 2018

    Failed: Mechanical - Rough In

    Need Nail Plate Over Refrigerant Lines At Top Plate In Garage

    Inspected by Troy Crews

  12. Sep 21, 2018

    Failed: Plumbing/Gas - Rough In

    Need Pressure On Water Lines And Fill 2nd Floor Waste Lines

    Inspected by Troy Crews

  13. Oct 2, 2018

    Cancelled: Building - Framing

    Inspected by Troy Crews

  14. Oct 2, 2018

    Cancelled: Electrical - Rough In

    Inspected by Troy Crews

  15. Oct 3, 2018

    Passed: Mechanical - Rough In

    Item Corrected

    Inspected by Troy Crews

  16. Oct 3, 2018

    Passed: Plumbing/Gas - Rough In

    Items Corrected

    Inspected by Troy Crews

  17. Oct 22, 2018

    Passed: Building - Insulation

    Inspected by Troy Crews

  18. Jan 29, 2019

    Failed: Electrical - Permanent Power

    Need Door Locks And Garage Door

    Inspected by Troy Crews

  19. Feb 12, 2019

    Passed: Electrical - Permanent Power

    Inspected by Troy Crews

  20. Feb 12, 2019

    Release to power company

    Blower Door Test Rec'd 12/10/19

    Inspected by Troy Crews

  21. Dec 11, 2019

    Passed: Building - Final

    Inspected by Troy Crews