Status Completed
  1. Submitted Jun 12, 2018
  2. Issued Jun 12, 2018
  3. Expires Jul 7, 2019
  4. Completed Jan 9, 2018

Property

Parcel #
02731-050
Owner
The Preserve At Laurel Lakes,inc.
Acres
0.48
Subdivision
The Preserve At Laurel Lakes
Zoning
PRD
Flood zone
X
District
3

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0290D
This is the construction of a
SFD/UTILITY
Setbacks Front
25.00
Setback Side 1
10.00
Setback Side 2
10.00
Setbacks Rear
15.00
Stories
1
Heated Area (Sqft)
2184.00
Total Area (Sqft)
3095.00
Building Code Edition
Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Septic# (00-0000) or (X00-000)
X-CITY

Status & Review History

No status updates yet.

Contractors

  • Aaron Simque

    License
    R282811879
    Title
    —
    Role
    —

    County License & State License & Liability Insurance & Workers Comp Expired.

Inspections

  1. Jun 26, 2018

    Passed: Building - Footer

    Inspected by Troy Crews

  2. Jun 26, 2018

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  3. Jul 11, 2018

    Passed: Plumbing/Gas - Underground Rough-In

    Waste Only

    Inspected by Troy Crews

  4. Jul 17, 2018

    Passed: Building - Slab

    Inspected by Troy Crews

  5. Aug 22, 2018

    Passed: Building - Roof Decking

    Inspected by Troy Crews

  6. Aug 22, 2018

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Troy Crews

  7. Sep 21, 2018

    Failed: Building - Framing

    Nail Piggyback Straps, Repair Studs Under T-05 Truss, Strapping Needed On T-09 Truss,draftstop All Concealed Areas Open To Attic, Draftstop Chimney

    Inspected by Troy Crews

  8. Sep 21, 2018

    Passed: Electrical - Rough In

    Inspected by Troy Crews

  9. Sep 21, 2018

    Passed: Mechanical - Rough In

    Inspected by Troy Crews

  10. Sep 21, 2018

    Failed: Plumbing/Gas - Rough In

    Need To Move Drain At T-05 Truss

    Inspected by Troy Crews

  11. Oct 2, 2018

    Cancelled: Electrical - Rough In

    Inspected by Troy Crews

  12. Oct 2, 2018

    Cancelled: Mechanical - Rough In

    Inspected by Troy Crews

  13. Oct 3, 2018

    Passed: Building - Framing

    Items Corrected

    Inspected by Troy Crews

  14. Oct 3, 2018

    Passed: Plumbing/Gas - Rough In

    Items Corrected

    Inspected by Troy Crews

  15. Oct 22, 2018

    Failed: Building - Insulation

    Do Not Sheetrock Fireplace Not Complete

    Inspected by Troy Crews

  16. Nov 29, 2018

    Failed: Electrical - Permanent Power

    Need To Complete Insulation Inspection.,no Garage Door No Door Locks

    Inspected by Troy Crews

  17. Dec 21, 2018

    Failed: Electrical - Permanent Power

    No Door Locks No Front Door

    Inspected by Troy Crews

  18. Jan 3, 2019

    Passed: Electrical - Permanent Power

    Inspected by Troy Crews

  19. Jan 3, 2019

    Release to power company

    Inspected by Troy Crews

  20. Jan 8, 2019

    Passed: Building - Final

    Inspected by Troy Crews