Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 271 SW PLANTATION TER LAKE CITY FL 32055
Parcel #: 02941-113
Acres: 0.80
Owner: Melvin Towner & Marlene Kenney
Subdivision: Southern Landings Aviation
Zoning: RSF-2
Flood Zone: X
District: 5
Application #: 37857
Permit #: 000036723
Related Permit: Culvert: 000002599
Submitted: Friday, May 11, 2018
Issued: Friday, May 11, 2018
Expires: Thursday, November 29, 2018
Completed: Thursday, November 29, 2018
Status: Completed
Septic Release? Yes
Notes:
1 FOOT ABOVE ROAD. NOC ON FILE.
Job Details
This is the construction of a SFD/UTILITY
Heated Area (Sqft) 2521.00
Total Area (Sqft) 3570.00
Stories 1
Setbacks Front 25.00
Setback Side 1 10.00
Setback Side 2 10.00
Setbacks Rear 15.00
Septic# 18-0306
Power Company CLAY
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Fema map number 12023C0293D
Review Notes
Contractors
Name/ Business License Title Role
Bryan Zecher

CBC054575
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway Dm 5/16/2018
Release to power company Troy Crews 5/22/2018
Passed: Building - Footer Troy Crews 5/23/2018
Passed: Engineering - Setbacks Troy Crews 5/23/2018
Passed: Electrical - Temporary Service Troy Crews 5/23/2018
Passed: Plumbing/Gas - Underground Rough-In Troy Crews 6/5/2018
Passed: Building - Slab Randy Jones 6/15/2018
Passed: Building - Slab Front Porch Troy Crews 6/26/2018
Passed: Building - Ext Strapping/Wall Sheathing Troy Crews 7/6/2018
Passed: Electrical - Rough In Troy Crews 8/1/2018
Passed: Mechanical - Rough In Troy Crews 8/1/2018
Passed: Plumbing/Gas - Rough In Troy Crews 8/1/2018
Passed: Building - Framing Troy Crews 8/1/2018
Passed: Building - Insulation Troy Crews 8/8/2018
Passed: Engineering - Final Driveway David Mccormick 10/3/2018
Failed: Electrical - Permanent Power No Conduit For Power Company. Tommy Matthews 10/22/2018
Passed: Electrical - Permanent Power Need Health Release Troy Crews 10/25/2018
Release to power company Rec'd Health Dept! Jlw/tc 10/26/2018
Septic Release Inspection Updated Into The Computer 10/29/18 Health Dept 10/29/2018
Passed: Building - Final Tommy Matthews 11/28/2018
Documents
File Name Date File Size
Permit-000036723.pdf 2023.12.26 42.30kB
Certificate Of Occupancy.pdf 2023.12.26 141.89kB
Permit-36723.pdf 2023.12.26 42.30kB