Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 341 SW CREST GLEN LAKE CITY FL 32024
Parcel #: 02905-332
Acres: 0.51
Owner: Stanley Crawford Construction, Inc
Subdivision: Woodcrest
Zoning: RSF-2
Flood Zone: X
District:
Application #: 37575
Permit #: 000036625
Related Permit: Culvert: 000002586
Submitted: Wednesday, April 25, 2018
Issued: Wednesday, April 25, 2018
Expires: Monday, October 1, 2018
Completed: Monday, October 1, 2018
Status: Completed
Septic Release? Yes
Notes:
1 FOOT ABOVE ROAD. Blower dooR test recieved
Job Details
This is the construction of a SFD/UTILITY
Heated Area (Sqft) 1482.00
Total Area (Sqft) 2149.00
Stories 1
Setbacks Front 25.00
Setback Side 1 10.00
Setback Side 2 10.00
Setbacks Rear 15.00
Septic# 18-0188
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Review Notes
Contractors
Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date
Engineering-Initial Driveway David Mccormick 4/30/2018
Passed: Building - Footer Randy Jones 5/4/2018
Passed: Engineering - Setbacks Randy Jones 5/4/2018
Failed: Building - Slab Need Letter From Plumber That Plumbing Is To Code Prior To Pour Troy Crews 5/21/2018
Passed: Plumbing/Gas - Underground Rough-In Based On Letter From Plumber Troy Crews 5/23/2018
Passed: Building - Slab Troy Crews 5/23/2018
Passed: Electrical - Temporary Service Troy Crews 6/5/2018
Release to power company Troy Crews 6/5/2018
Passed: Building - Roof Decking Troy Crews 6/21/2018
Passed: Building - Ext Strapping/Wall Sheathing Troy Crews 6/21/2018
Failed: Building - Framing Check All Anchor Bolts For Tightness ,missing Bolt Right Side Doorway At Garage And Missing Washers Troy Crews 7/5/2018
Passed: Electrical - Rough In Troy Crews 7/5/2018
Passed: Mechanical - Rough In Troy Crews 7/5/2018
Passed: Plumbing/Gas - Tub Set/Shower Pan Troy Crews 7/5/2018
Rescheduled 7/10/2018:Building - Insulation Troy Crews 7/9/2018
Passed: Building - Insulation Troy Crews 7/10/2018
Passed: Building - Framing Anchor Bolts Corrected Troy Crews 7/10/2018
Release to power company Laurie Hodson 9/7/2018
Passed: Engineering - Final Driveway David Mccormick 9/7/2018
Septic Release Inspection Rec'd Driveway Final Health Dept 9/7/2018
Passed: Electrical - Permanent Power Need Driveway Final Troy Crews 9/7/2018
Failed: Building - Final Need Blower Door Test. need Bumper Protection Foe Ac In Garage. Tommy Matthews 9/26/2018
Passed: Building - Final Tommy Matthews 10/1/2018
Documents
File Name Date File Size
Permit-000036625.pdf 2023.12.26 39.94kB
Certificate Of Occupancy.pdf 2023.12.26 141.89kB