| Septic Release Inspection |
|
Health Dept |
4/25/2018 |
| Rescheduled 5/16/2018:Swimming Pool - Pool Steel and Ground |
|
Randy Jones |
5/16/2018 |
| Rescheduled 5/16/2018:Engineering - Setbacks |
|
Randy Jones |
5/16/2018 |
| Passed: Swimming Pool - Pool Steel and Ground |
|
Tommy Matthews |
5/16/2018 |
| Passed: Engineering - Setbacks |
|
Tommy Matthews |
5/16/2018 |
| Passed: Swimming Pool - Pool Footer |
|
Tommy Matthews |
5/23/2018 |
| Passed: Engineering - Setbacks |
|
Tommy Matthews |
5/23/2018 |
| Passed: Swimming Pool - Pool Deck/Piping Pressure |
|
Tommy Matthews |
5/23/2018 |
| Passed: Swimming Pool - Pool Safety and Final |
|
Tommy Matthews |
7/25/2018 |