Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 648 SW CHESTERFIELD CIRCLE LAKE CITY FL 32024
Parcel #: 03117-141
Acres: 0.50
Owner: Delta Omega Properties Inc
Subdivision: Crosswinds
Zoning: RSF-2
Flood Zone: X
District:
Application #: 37708
Permit #: 000036613
Related Permit: Culvert: 000002469
Submitted: Monday, April 23, 2018
Issued: Monday, April 23, 2018
Expires: Friday, February 22, 2019
Completed: Friday, February 22, 2019
Status: Completed
Septic Release? Yes
Notes:
FLOOR ONE FOOT ABOVE THE ROAD, NOC ON FILE PREVIOUS CULVERT PERMIT 2469, NEEDS FINAL INSPECTION BEFORE POWER-DONE
Job Details
This is the construction of a SFD, UTILITY
Heated Area (Sqft) 1523.00
Total Area (Sqft) 2160.00
Stories 1
Setbacks Front 25.00
Setback Side 1 10.00
Setback Side 2 10.00
Setbacks Rear 15.00
Septic# 18-0299
Power Company CLAY
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Review Notes
Contractors
Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date
Passed: Electrical - Temporary Service Troy Crews 5/3/2018
Release to power company Troy Crews 5/3/2018
Passed: Electrical - Underground Rough-In Troy Crews 5/4/2018
Passed: Plumbing/Gas - Underground Rough-In Troy Crews 5/4/2018
Passed: Building - Slab Troy Crews 5/14/2018
Cancelled: Building - Monolithic Slab Troy Crews 5/15/2018
Cancelled: Engineering - Setbacks Troy Crews 5/15/2018
Passed: Building - Monolithic Slab Randy Jones 5/16/2018
Passed: Engineering - Setbacks Randy Jones 5/16/2018
Release to power company Temp Svc Was Originally Sent 5.3.18 per Clay - To Resend!!! Jlw/tc 8/14/2018
Cancelled: Electrical - Temporary Service Troy Crews 8/14/2018
Passed: Building - Roof Decking Tommy Matthews 9/4/2018
Passed: Building - Ext Strapping/Wall Sheathing Tommy Matthews 9/4/2018
Engineering-Initial Driveway David Mccormick 9/6/2018
Failed: Building - Framing Truss Plans Do Not Match Dated April 5th. Garage End Wall Detail Was Not Used As Per Plan. Tommy Matthews 9/11/2018
Passed: Electrical - Rough In Tommy Matthews 10/2/2018
Passed: Mechanical - Rough In Tommy Matthews 10/2/2018
Passed: Plumbing/Gas - Rough In Tommy Matthews 10/2/2018
Failed: Building - Framing Same Problems As Before. Do This Again And There Will Be A Reinspection Fee Charged. Tommy Matthews 10/2/2018
Failed: Building - Insulation Wall Between Garage And Home Is Not Insulated Tommy Matthews 10/8/2018
Failed: Building - Framing Garage Door Header Not As Per Plans. two Trusses Need Bracing Tommy Matthews 10/8/2018
Rescheduled 10/12/2018:Building - Framing Troy Crews 10/11/2018
Rescheduled 10/13/2018:Building - Insulation Troy Crews 10/11/2018
Passed: Building - Insulation Troy Crews 10/12/2018
Failed: Building - Framing Still Need Letter For Garage Header From Architect Troy Crews 10/12/2018
Passed: Engineering - Final Driveway David Mccormick 1/3/2019
Passed: Electrical - Permanent Power Septic Release Tommy Matthews 1/4/2019
Release to power company Laurie Hodson 1/9/2019
Septic Release Inspection Health Dept 1/9/2019
Passed: Building - Final Blower Door Test Rec'd Troy Crews 2/22/2019
Documents
File Name Date File Size
Permit-000036613.pdf 2023.12.26 44.76kB
Certificate Of Occupancy.pdf 2023.12.26 141.10kB
Application Packet 2018-10-12 4.33.59 Pm (revision).pdf 2023.12.26 35.31kB