Inspection |
Notes |
Performed By |
Date |
Passed: Electrical - Temporary Service |
|
Troy Crews |
5/3/2018 |
Release to power company |
|
Troy Crews |
5/3/2018 |
Passed: Electrical - Underground Rough-In |
|
Troy Crews |
5/4/2018 |
Passed: Plumbing/Gas - Underground Rough-In |
|
Troy Crews |
5/4/2018 |
Passed: Building - Slab |
|
Troy Crews |
5/14/2018 |
Cancelled: Building - Monolithic Slab |
|
Troy Crews |
5/15/2018 |
Cancelled: Engineering - Setbacks |
|
Troy Crews |
5/15/2018 |
Passed: Building - Monolithic Slab |
|
Randy Jones |
5/16/2018 |
Passed: Engineering - Setbacks |
|
Randy Jones |
5/16/2018 |
Release to power company |
Temp Svc Was Originally Sent 5.3.18
per Clay - To Resend!!! |
Jlw/tc |
8/14/2018 |
Cancelled: Electrical - Temporary Service |
|
Troy Crews |
8/14/2018 |
Passed: Building - Roof Decking |
|
Tommy Matthews |
9/4/2018 |
Passed: Building - Ext Strapping/Wall Sheathing |
|
Tommy Matthews |
9/4/2018 |
Engineering-Initial Driveway |
|
David Mccormick |
9/6/2018 |
Failed: Building - Framing |
Truss Plans Do Not Match Dated April 5th. Garage End Wall Detail Was Not Used As Per Plan. |
Tommy Matthews |
9/11/2018 |
Passed: Electrical - Rough In |
|
Tommy Matthews |
10/2/2018 |
Passed: Mechanical - Rough In |
|
Tommy Matthews |
10/2/2018 |
Passed: Plumbing/Gas - Rough In |
|
Tommy Matthews |
10/2/2018 |
Failed: Building - Framing |
Same Problems As Before. Do This Again And There Will Be A Reinspection Fee Charged. |
Tommy Matthews |
10/2/2018 |
Failed: Building - Insulation |
Wall Between Garage And Home Is Not Insulated |
Tommy Matthews |
10/8/2018 |
Failed: Building - Framing |
Garage Door Header Not As Per Plans.
two Trusses Need Bracing |
Tommy Matthews |
10/8/2018 |
Rescheduled 10/12/2018:Building - Framing |
|
Troy Crews |
10/11/2018 |
Rescheduled 10/13/2018:Building - Insulation |
|
Troy Crews |
10/11/2018 |
Passed: Building - Insulation |
|
Troy Crews |
10/12/2018 |
Failed: Building - Framing |
Still Need Letter For Garage Header From Architect |
Troy Crews |
10/12/2018 |
Passed: Engineering - Final Driveway |
|
David Mccormick |
1/3/2019 |
Passed: Electrical - Permanent Power |
Septic Release |
Tommy Matthews |
1/4/2019 |
Release to power company |
|
Laurie Hodson |
1/9/2019 |
Septic Release Inspection |
|
Health Dept |
1/9/2019 |
Passed: Building - Final |
Blower Door Test Rec'd |
Troy Crews |
2/22/2019 |