Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 186 SPARR LN LAKE CITY FL 32055
Parcel #: 01720-001
Acres: 0.25
Owner: Janet Johnson/jim Inglese (1/2 Interest)
Subdivision: Suwannee Valley Est
Zoning: AG-3
Flood Zone: X
District: 1
Application #: 37398
Permit #: 000036569
Related Permit: Culvert: 000002579
Submitted: Wednesday, April 11, 2018
Issued: Wednesday, April 11, 2018
Expires: Thursday, February 14, 2019
Completed: Thursday, February 14, 2019
Status: Completed
Septic Release? Yes
Notes:
ONE FOOT ABOVE THE HIGHEST ADJACENT ROAD GRADE, NEED ELEVATION LETTER BEFORE CO, NOC ON FILE. ELEVATION LETTER REC'D AT 105.4', WHICH IS MORE THAN 1' ABOVE BOTH SPARR LN & AUSTIN WAY
Job Details
This is the construction of a SFD, UTILITY
Heated Area (Sqft) 1218.00
Total Area (Sqft) 1876.00
Stories 1
Setbacks Front 30.00
Setback Side 1 25.00
Setback Side 2 25.00
Setbacks Rear 25.00
Septic# (00-0000) or (X00-000) 18-0300
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Fema map number 12023C0187D
Review Notes
Contractors
Name/ Business License Title Role
James Johnston

County License & State License & Liability Insurance & Workers Comp & Employees Workers Comp Expired.
CRC1328128
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway 4/13/2018
Passed: Building - Footer Troy Crews 4/17/2018
Passed: Engineering - Setbacks 25 Ft. Confirmed On Both Fronts. Troy Crews 4/17/2018
Rescheduled 4/23/2018:Plumbing/Gas - Rough In Randy Jones 4/23/2018
Passed: Plumbing/Gas - Rough In Troy Crews 4/23/2018
Passed: Building - Slab Troy Crews 4/25/2018
Passed: Building - Roof Decking Troy Crews 5/2/2018
Passed: Building - Ext Strapping/Wall Sheathing Troy Crews 5/2/2018
Passed: Electrical - Rough In Troy Crews 6/27/2018
Passed: Mechanical - Rough In Troy Crews 6/27/2018
Passed: Plumbing/Gas - Rough In Troy Crews 6/27/2018
Passed: Building - Framing Block Top Of Interior Shear Wall Troy Crews 6/28/2018
Passed: Building - Insulation Troy Crews 6/29/2018
Passed: Engineering - Final Driveway Waiver Approved David Mccormick 9/27/2018
Passed: Electrical - Permanent Power Troy Crews 9/27/2018
Release to power company Need Elevation Letter Before Co Laurie Hodson 10/2/2018
Septic Release Inspection Health Dept 10/2/2018
Passed: Building - Final Release Of Co Pending Elevation Letter, Rec'd 2-14-19 Troy Crews 2/11/2019
Documents
File Name Date File Size
Permit-000036569.pdf 2023.12.26 37.10kB
9_26_18 Waiver Permit Issued.pdf 2023.12.26 53.47kB
Elevation Letter 2019-02-14 11.03.50 Am (addendum).pdf 2023.12.26 29.48kB
Certificate Of Occupancy.pdf 2023.12.26 141.11kB
Permit-36569.pdf 2023.12.26 37.10kB