Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 507 SW SUWANNEE DOWNS DR
LAKE CITY, FL 32024
Parcel #: 02431-106
Acres: 5.05
Owner: Michelle H. Richards
Subdivision: Suwannee Rivers Downs
Zoning: A-3
Flood Zone: X
District: 3
Application #: 37330
Permit #: 000036535
Related Permit:
Submitted: Thursday, April 5, 2018
Issued: Thursday, August 19, 2021
Expires: Saturday, August 20, 2022
Completed:
Status: Permit Renewed
Septic Release? No
Notes:
1 FOOT ABOVE ROAD. BLOWER DOOR AND TERMITE FINAL REQUIRED PRIOR TO CO
Job Details
Finished floor requirement
Fema map number 12023C0290D
This is the construction of a SFD/UTILITY
Setbacks Front 30.00
Setback Side 1 25.00
Setback Side 2 25.00
Setbacks Rear 25.00
Stories 2
Heated Area (Sqft) 4722.00
Total Area (Sqft) 7855.00
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Septic# (00-0000) or (X00-000) 18-0009
Review Notes
12/13/2019 Permit Renewed Permit renewed. Original approved date of 4/5/2018 expired on 1/23/2019
8/19/2021 Permit Renewed Permit renewed. Original approved date of 12/13/2019 expired on 7/19/2021
Contractors
Name/ Business License Title Role
Michelle Richards

OWNER
Inspections
Inspection Notes Performed By Date
Passed: Plumbing/Gas - Underground Rough-In Troy Crews 5/2/2018
Passed: Building - Footer Troy Crews 6/5/2018
Passed: Engineering - Setbacks Troy Crews 6/5/2018
Passed: Building - Slab Troy Crews 6/5/2018
Release to power company Tommy Matthews 7/26/2018
Passed: Electrical - Temporary Service Tommy Matthews 7/27/2018
Passed: Building - Masonry Wall Reinforcing First Floor Walls Troy Crews 4/8/2020
Passed: Building - Framing Partial Framing Of Steel Structure Troy Crews 10/16/2020
Passed: Building - Framing Partial, Still Need To Finish Bolts From Main Beams To Roof Purlins, Also Reminder All Bedrooms Need Egress Door Or Window Troy Crews 1/20/2021
Failed: Electrical - 2nd Rough-In Need Better Directions Matt Forsyth 9/3/2021
Passed: Electrical - 2nd Rough-In Safety Railing Needed Inspection 4 Floors Matt Forsyth 9/3/2021
Passed: Electrical - 2nd Rough-In Upstairs Not Roughed In Yet Matt Forsyth 2/21/2022
Passed: Plumbing/Gas - 2nd Rough-In Need Shower Valves Installed Matt Forsyth 2/21/2022