Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 3545 SW CUSTOM MADE CIRCLE LAKE CITY FL 32024
Parcel #: 09280-101
Acres: 6.40
Owner: Gary & Kathleen Neal
Subdivision: The Oaks Of Lake City
Zoning: PRRD
Flood Zone: X
District: 5
Application #: 37304
Permit #: 000036521
Related Permit: Culvert: 000002577
Submitted: Tuesday, April 3, 2018
Issued: Tuesday, April 3, 2018
Expires: Friday, November 30, 2018
Completed: Friday, November 30, 2018
Status: Completed
Septic Release? Yes
Notes:
MFE @ 88.00', MINIMUM FLOOR ELEVATION LETTER REC'D AT 89.28' Blower door test and fresh air intake pictures in file
Job Details
This is the construction of a SFD/UTILITY
Heated Area (Sqft) 3646.00
Total Area (Sqft) 5425.00
Stories 1
Setbacks Front 30.00
Setback Side 1 25.00
Setback Side 2 25.00
Setbacks Rear 25.00
Septic# 18-0096
Power Company CLAY
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Fema map number 12023C0395C
Review Notes
Contractors
Name/ Business License Title Role
Bryan Zecher

CBC054575
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway Bs 4/5/2018
Passed: Electrical - Temporary Service Troy Crews 4/6/2018
Release to power company Troy Crews 4/6/2018
Passed: Building - Footer Troy Crews 4/12/2018
Passed: Engineering - Setbacks Troy Crews 4/12/2018
Cancelled: Building - Footer Laurie Hodson 4/23/2018
Cancelled: Engineering - Setbacks Laurie Hodson 4/23/2018
Passed: Plumbing/Gas - Underground Rough-In Randy Jones 4/24/2018
Passed: Building - Slab Troy Crews 4/26/2018
Passed: Building - Slab Porches Troy Crews 5/7/2018
Passed: Building - Roof Decking Troy Crews 6/21/2018
Passed: Building - Ext Strapping/Wall Sheathing Troy Crews 6/21/2018
Passed: Building - Framing Troy Crews 6/21/2018
Passed: Electrical - Rough In Troy Crews 7/9/2018
Passed: Mechanical - Rough In Troy Crews 7/9/2018
Passed: Plumbing/Gas - Rough In Troy Crews 7/9/2018
Passed: Building - Insulation Troy Crews 8/3/2018
Passed: Engineering - Final Driveway David Mccormick 10/11/2018
Passed: Electrical - Permanent Power Need Health Troy Crews 10/12/2018
Release to power company Laurie Hodson 10/15/2018
Septic Release Inspection Health Dept 10/15/2018
Passed: Building - Final Troy Crews 11/28/2018
Documents
File Name Date File Size
Permit-36521.pdf 2023.12.26 32.47kB
Elevation Letter.pdf 2023.12.26 29.20kB
Certificate Of Occupancy.pdf 2023.12.26 141.09kB
Permit-000036521.pdf 2023.12.26 32.47kB