Inspection |
Notes |
Performed By |
Date |
Passed: Building - Footer |
|
Troy Crews |
3/27/2018 |
Passed: Engineering - Setbacks |
|
Troy Crews |
3/27/2018 |
Passed: Plumbing/Gas - Underground Rough-In |
|
Troy Crews |
4/23/2018 |
Passed: Building - Slab |
|
Troy Crews |
4/26/2018 |
Passed: Building - Lintel/Tie Beam |
|
Troy Crews |
5/14/2018 |
Passed: Building - Roof Decking |
|
Troy Crews |
6/6/2018 |
Passed: Electrical - Temporary Service |
|
Randy Jones |
7/5/2018 |
Release to power company |
|
Randy Jones |
7/5/2018 |
Failed: Building - Framing |
Have April 4th Truss Plans In Permit Box And In Order For Reinspection. Revised Plans Need To Be Reviewed. Check Uplift On Trusses.need Structural Plans On Site And In Permit Box So Inspector Can Find Them. |
Tommy Matthews |
7/16/2018 |
Failed: Electrical - Rough In |
No Smokes Installed |
Tommy Matthews |
7/16/2018 |
Failed: Mechanical - Rough In |
Not Finished With Dryer Vent And Roof Cap Installed |
Tommy Matthews |
7/16/2018 |
Failed: Plumbing/Gas - Rough In |
Vent.pipe Over Laundry Area Will Have To Be Cut For Dryer Vent |
Tommy Matthews |
7/16/2018 |
Passed: Building - Framing |
|
Tommy Matthews |
7/19/2018 |
Passed: Electrical - Rough In |
|
Tommy Matthews |
7/19/2018 |
Passed: Mechanical - Rough In |
|
Tommy Matthews |
7/19/2018 |
Passed: Plumbing/Gas - Rough In |
|
Tommy Matthews |
7/19/2018 |
Passed: Building - Insulation |
|
Randy Jones |
7/23/2018 |
Passed: Electrical - Permanent Power |
|
Tommy Matthews |
9/13/2018 |
Release to power company |
|
Tommy Matthews |
9/13/2018 |
Release to power company |
Resent Per Contractor |
Laurie Hodson |
9/25/2018 |
Septic Release Inspection |
Was Released By Env Health On 9/14/18. Corrected Septic Number On 9/25/18 |
Health Dept |
9/25/2018 |
Passed: Building - Final |
Release Of Co Pending Blower Door Test, Rec'd 10/31/18 |
Troy Crews |
10/30/2018 |