Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 213 NW ANSLEY PL LAKE CITY FL 32055
Parcel #: 02202-127
Acres: 1.78
Owner: Brown Road Builders Inc
Subdivision: High Pointe
Zoning: PRD
Flood Zone: X
District: 3
Application #: 37057
Permit #: 000036448
Related Permit: Culvert: 000002567
Submitted: Thursday, March 15, 2018
Issued: Thursday, March 15, 2018
Expires: Tuesday, October 9, 2018
Completed: Tuesday, October 9, 2018
Status: Completed
Septic Release? Yes
Notes:
FLOOR ONE FOOT ABOVE THE ROAD Blower door test above attic stairs
Job Details
This is the construction of a SFD, UTILITY
Heated Area (Sqft) 2210.00
Total Area (Sqft) 3000.00
Stories 1
Setbacks Front 30.00
Setback Side 1 25.00
Setback Side 2 25.00
Setbacks Rear 25.00
Septic# 18-0080
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Fema map number 12023C0280D
Review Notes
Contractors
Name/ Business License Title Role
Aaron Simque

County License & State License Expired.
R282811879
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway Dm 3/21/2018
Passed: Building - Footer Troy Crews 3/26/2018
Passed: Engineering - Setbacks Troy Crews 3/26/2018
Failed: Plumbing/Gas - Underground Rough-In Dryer Vent Line Too Long Troy Crews 4/9/2018
Passed: Plumbing/Gas - Underground Rough-In Dryer Vent To Be Run Overhead Per. Contractor Troy Crews 4/10/2018
Passed: Building - Slab Troy Crews 4/17/2018
Passed: Building - Framing Troy Crews 5/25/2018
Passed: Electrical - Rough In Troy Crews 5/25/2018
Failed: Mechanical - Rough In Not Complete Troy Crews 5/25/2018
Failed: Plumbing/Gas - Rough In No Pressure On Water Lines Troy Crews 5/25/2018
Failed: Building - Insulation Insulation Needs Repair Also Need Mechanicals Inspected Troy Crews 6/7/2018
Passed: Electrical - Rough In Troy Crews 7/19/2018
Passed: Mechanical - Rough In Troy Crews 7/19/2018
Passed: Plumbing/Gas - Rough In Pressure On Lines Troy Crews 7/19/2018
Passed: Building - Insulation Garage Blown In Walls Troy Crews 7/19/2018
Passed: Engineering - Final Driveway David Mccormick 10/9/2018
Septic Release Inspection Health Dept 10/9/2018
Passed: Building - Final Pending Driveway Final, Rec'd Troy Crews 10/9/2018
Passed: Electrical - Permanent Power Pending Driveway Final Troy Crews 10/9/2018
Documents
File Name Date File Size
Permit-36448.pdf 2023.12.26 37.77kB
Permit-000036448.pdf 2023.12.26 37.77kB
Certificate Of Occupancy.pdf 2023.12.26 141.09kB