Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 775 SW MANDIBA DR LAKE CITY FL 32024
Parcel #: 09280-125
Acres: 1.00
Owner: Thomas & Arica Bulock
Subdivision: The Oaks
Zoning: PRRD
Flood Zone: X
District: 5
Application #: 36585
Permit #: 000036302
Related Permit: Culvert: 000002539
Submitted: Thursday, February 8, 2018
Issued: Thursday, February 8, 2018
Expires: Tuesday, January 29, 2019
Completed:
Status:
Septic Release? Yes
Notes:
FLOOR ONE FOOT ABOVE THE ROAD, NOC ON FILE CORRECTED TO MFE 88' - NEED ELEVATION LETTER AT SLAB, ELEVATION LETTER REC'D AT 91.4' Blower door test recieved
Job Details
Finished floor requirement
Fema map number 12023C0395C
This is the construction of a SFD, UTILITY
Setbacks Front 30.00
Setback Side 1 25.00
Setback Side 2 25.00
Setbacks Rear 25.00
Stories 1
Heated Area (Sqft) 2785.00
Total Area (Sqft) 4137.00
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Septic# (00-0000) or (X00-000) 18-0018
Review Notes
Contractors
Name/ Business License Title Role
David Simque

Liability Insurance Expired.
CGC1516165
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway Dm 2/14/2018
Passed: Building - Footer Troy Crews 2/16/2018
Passed: Engineering - Setbacks Troy Crews 2/16/2018
Passed: Plumbing/Gas - Underground Rough-In Troy Crews 2/27/2018
Passed: Building - Slab Troy Crews 3/12/2018
Release to power company Troy Crews 3/19/2018
Passed: Electrical - Temporary Service Troy Crews 3/20/2018
Passed: Building - Ext Strapping/Wall Sheathing Walls Only Troy Crews 3/29/2018
Passed: Building - Roof Decking Troy Crews 5/4/2018
Passed: Building - Framing Troy Crews 6/6/2018
Passed: Building - Insulation Troy Crews 6/6/2018
Passed: Electrical - Rough In Troy Crews 6/6/2018
Passed: Mechanical - Rough In Troy Crews 6/6/2018
Passed: Electrical - Permanent Power Release Pending Driveway And Health Troy Crews 7/20/2018
Septic Release Inspection Health Dept 7/24/2018
Release to power company Laurie Hodson 7/25/2018
Passed: Engineering - Final Driveway Dm 7/26/2018
CERTIFICATE OF OCCUPANCY/COMPLETION DATE 8/2/2018
Passed: Building - Final Pending Blower Door Troy Crews 8/2/2018