Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 289 SW HIGH FIELD TERR LAKE CITY FL 32024
Parcel #: 03761-131
Acres: 5.00
Owner: Carlos Hechavarria
Subdivision: Meadowlands
Zoning: A-3
Flood Zone: X
District: 4
Application #: 36103
Permit #: 000036004
Related Permit:
Submitted: Thursday, November 16, 2017
Issued: Thursday, November 16, 2017
Expires: Thursday, September 19, 2019
Completed: Thursday, September 19, 2019
Status: Completed
Septic Release? No
Notes:
1 FOOT ABOVE ROAD. NOC REC'D.
Job Details
This is the construction of a GUEST HOUSE
Heated Area (Sqft) 792.00
Total Area (Sqft) 892.00
Setbacks Front 30.00
Setback Side 1 25.00
Setback Side 2 25.00
Setbacks Rear 25.00
Septic# (00-0000) or (X00-000) 17-0694
Building Code Edition Florida Building Code 2014 5th Edition & 2011 National Electrical Code
Fema map number 12023C0485C
Review Notes
Contractors

This is an owner builder project.

Name/ Business License Title Role
Carlos Hechavarria

OWNER
Inspections
Inspection Notes Performed By Date
Passed: Plumbing/Gas - Underground Rough-In Waste Lines Troy Crews 1/3/2018
Passed: Building - Slab Mono Slab 16x18 Troy Crews 1/18/2018
Rescheduled 5/8/2018:Building - Lintel/Tie Beam Owner Changed The Date Laurie Hodson 5/7/2018
Passed: Building - Lintel/Tie Beam Troy Crews 5/8/2018
Passed: Building - Ext Strapping/Wall Sheathing Roof Sheathing Troy Crews 7/9/2018
Passed: Electrical - Rough In Troy Crews 11/27/2018
Passed: Plumbing/Gas - Water Pipe Troy Crews 11/27/2018
Passed: Building - Framing Troy Crews 11/27/2018
Passed: Building - Insulation Troy Crews 1/2/2019
Passed: Electrical - Permanent Power Power From Main House Troy Crews 6/17/2019
Passed: Building - Final Troy Crews 9/19/2019
Documents
File Name Date File Size
Permit-36004.pdf 2023.12.26 30.08kB
Permit-000036004.pdf 2023.12.26 30.08kB
Certificate Of Occupancy 20190919.pdf 2023.12.26 50.54kB