Search pages and services on the county website.
Choose the colors you prefer.
Permit
13700 S US HIGHWAY 441 LAKE CITY FL 32025
No status updates yet.
Carl Herndon
County License & State License & Liability Insurance & Workers Comp Expired.
Foundation Inspection
Inspected by Troy Crews
Setback Inspection
Temporary Power Inspection
Passed: Foundation
Slab Inspection
Passed: Building - Footer
Tire Shop Partial
Cancelled: Building - Footer
Rough-In Plumbing Inspection
Passed: Plumbing/Gas - Underground Rough-In
Waste Lines Tire Shop
Monolithic Slab Inspection
Partial Tire Shop
Passed: Building - Slab
Partial Slab Tire Store.
Passed: Fire - Underground Main - Visual
Done By F.d 12-13-17 Partial
Inspected by J.w.
Passed: Building - Ext Strapping/Wall Sheathing
Main Building Walls
Underslab Rough Plumbing Inspection
Inspected by Josh Wehinger
Passed: Plumbing/Gas - Interceptor
Grease Trap
Framing Inspection
Electrical Rough-In Inspection
Passed: Building - Framing
North End Bathroom Area
Passed: Electrical - Rough In
Passed: Plumbing/Gas - Water Pipe
Done By Josh 1-2-18
Passed: Building - Insulation
Exterior Walls North End
North End Exterior Walls
South End Of Building
Passed: Plumbing/Gas - Rough In
Truck Pump Area
Framing And Wall Sheathing Need To Look At Roof Screws,
Passed: Building - Rated Assembly Fastening
Rescheduled 3/9/2018:Building - Footer
Will @ 601-470-8201
Inspected by Laurie Hodson
Rescheduled 3/9/2018:Engineering - Setbacks
Canceled By Will 601-470-8201
Rescheduled 3/14/2018:Building - Footer
Will Changed Date (around Noon)
Rescheduled 3/14/2018:Engineering - Setbacks
Passed: Mechanical - Kitchen Hood
Grease Hoods
Passed: Mechanical - Light Test
Showed No Leaks
Passed: Mechanical - Rough In
Ceiling Rough In
Rescheduled 3/20/2018:Building - Footer
Rescheduled 3/20/2018:Engineering - Setbacks
Mono Pole Sign
Passed: Engineering - Setbacks
Passed: Electrical - Permanent Power
Awaiting Release From Public Works On Water And Sewer
Release to power company
Letter From County Water System Rec'd
Passed: Building - Above Ceiling
Passed: Fire - Operational Test - Chemical/Gaseous Agent
Passed: Building - Final
Pending D.o.t. Final And Public Works Release
Passed: Mechanical - Refrigeration
Rescheduled 5/23/2018:Engineering - Zoning Final
Passed: Fire - Fire Final
Failed: Engineering - Zoning Final
Site Was Not Complete. Landscaping Inspection Complete
Inspected by Brandon Stubbs
Plumbing/Gas-Water Pipe
Water & Sewer Services At County Connection Points
Inspected by Robert Dominque
Passed: Engineering - Final Driveway
Fdot Final Approval Rec'd
Inspected by Troy Register, Dot
Passed: Engineering - Zoning Final
All Complete
CERTIFICATE OF OCCUPANCY/COMPLETION DATE
Temporary Co For Store Use
Passed: Fire - Operational Test - Fire Pump
Tire Store
100 Amp Three Phase For Fire Pump
Building-Final
All Completed
Final Inspection