Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 259 SW FORD FEAGLE PL LAKE CITY FL 32024
Parcel #: 02940-003
Acres: 3.28
Owner: David & Keryn Breeden
Subdivision:
Zoning: RSF-2
Flood Zone: X
District: 3
Application #: 33415
Permit #: 000035554
Related Permit: Culvert Waiver: 000002451
Submitted: Thursday, July 13, 2017
Issued: Thursday, July 13, 2017
Expires: Thursday, February 1, 2018
Completed: Thursday, February 1, 2018
Status: Completed
Septic Release? Yes
Notes:
FLOOR ONE FOOT ABOVE THE ROAD, NOC ON FILE BLOWER DOOR TEST REQUIRED NAILING.08.23.17-TC
Job Details
This is the construction of a SFD, UTILITY
Heated Area (Sqft) 1753.00
Total Area (Sqft) 2480.00
Stories 1
Setbacks Front 25.00
Setback Side 1 10.00
Setback Side 2 10.00
Setbacks Rear 15.00
Septic# (00-0000) or (X00-000) 17-0437
Building Code Edition Florida Building Code 2014 5th Edition & 2011 National Electrical Code
Fema map number 12023C0293D
Review Notes
Contractors
Name/ Business License Title Role
Bradley Franks

R291103874
Inspections
Inspection Notes Performed By Date
Foundation Inspection Troy Crews 7/19/2017
Setback Inspection Troy Crews 7/19/2017
Temporary Power Inspection Tommy Matthews 7/26/2017
Underslab Rough Plumbing Inspection Tommy Matthews 7/26/2017
Slab Inspection Randy Jones 7/27/2017
Slab Inspection Randy Jones 7/27/2017
Sheathing and Nailing Inspection Tommy Matthews 8/10/2017
Framing Inspection Troy Crews 9/15/2017
Electrical Rough-in- select inspection options... Troy Crews 9/15/2017
Heat & AC- Troy Crews 9/15/2017
Rough-In Plumbing Inspection Troy Crews 9/15/2017
Electrical Rough-In Inspection Troy Crews 9/15/2017
Heat and Air Duct Inspection Troy Crews 9/15/2017
Insulation Inspection Troy Crews 9/26/2017
Failed: Electrical - Permanent Power Troy Crews 12/19/2017
Failed: Electrical - Permanent Power Need Door Lock In Garage Entry Tommy Matthews 12/29/2017
Passed: Electrical - Permanent Power Troy Crews 1/2/2018
Release to power company Laurie Hodson 1/8/2018
Septic Release Inspection Health Dept 1/8/2018
Failed: Building - Final Need Termite Cert. Blower Door Test Traffic Stop For Garage Equipment. Troy Crews 1/29/2018
Final Inspection 2/1/2018
CERTIFICATE OF OCCUPANCY/COMPLETION DATE 2/1/2018
Final Inspection Troy Crews 2/1/2018
Failed: Building - Final Need Blower Door Test Results Troy Crews 2/1/2018
Passed: Building - Final Blower Door Test Recieved Troy Crews 2/1/2018
(Requested) Framing
(Requested) Electrical Rough-in
(Requested) Heat & AC-Rough-in/Duct
(Requested) Insulation
Documents
File Name Date File Size
Certificate Of Occupancy.pdf 2023.12.26 141.09kB
Permit-35554.pdf 2023.12.26 37.37kB
Permit-000035554.pdf 2023.12.26 37.37kB