Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 830 SW MANDIBA DR
LAKE CITY, FL 32024
Parcel #: 09280-175
Acres: 1.00
Owner: Bryan Zecher Homes, Inc.
Subdivision: Oaks Of Lake City
Zoning: PRRD
Flood Zone: X
District: 5
Application #: 31653
Permit #: 000035521
Related Permit: Culvert: 000002446
Submitted: Friday, July 7, 2017
Issued: Friday, July 7, 2017
Expires: Friday, December 8, 2017
Completed: Friday, December 8, 2017
Status: Completed
Septic Release? Yes
Notes:
MFE @ 91.00'. MUST HAVE ELEVATION CERTIFICATE. BLOWER DOOR TEST REQUIRED. NOC REC'D. ECL REC'D @ 94.08' (TC) BLOWER DOOR REPORT REC'D.(TC)
Job Details
This is the construction of a SFD/UTILITY
Heated Area (Sqft) 2159.00
Total Area (Sqft) 3075.00
Stories 1
Building Height 20
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Setbacks Front 30.00
Setback Side 1 25.00
Setback Side 2 25.00
Setbacks Rear 25.00
Septic# (00-0000) or (X00-000) 17-0389-N
Service Amps 200
Building Code Edition Florida Building Code 2014 5th Edition & 2011 National Electrical Code
Fema map number 12023C0395C
Review Notes
Contractors
Name/ Business License Title Role
Bryan Zecher
Bryan Zecher Construction, Inc.
CBC054575 Cert.building Contractor
Inspections
Inspection Notes Performed By Date
Temporary Power Inspection Randy Jones 7/11/2017
Temporary Power Inspection Randy Jones 7/11/2017
Foundation Inspection Troy Crews 7/13/2017
Setback Inspection Troy Crews 7/13/2017
Underslab Rough Plumbing Inspection Tommy Matthews 7/26/2017
Slab Inspection Randy Jones 7/31/2017
Slab Inspection Randy Jones 7/31/2017
Framing Inspection Troy Crews 9/1/2017
Rough-In Plumbing Inspection Troy Crews 9/14/2017
Electrical Rough-in- select inspection options... Troy Crews 9/14/2017
Heat & AC- Troy Crews 9/14/2017
Electrical Rough-In Inspection Troy Crews 9/14/2017
Heat and Air Duct Inspection Troy Crews 9/14/2017
Insulation Inspection Troy Crews 9/19/2017
Sheathing and Nailing Inspection Troy Crews 9/23/2017
Permanent Power Inspection Troy Crews 11/2/2017
Septic Release Inspection Health Dept 11/9/2017
Passed: Building - Final Troy Crews 12/1/2017
Final Inspection Troy Crews 12/8/2017
CERTIFICATE OF OCCUPANCY/COMPLETION DATE 12/8/2017
(Requested) Temp Power-Under Ground
(Requested) Foundation
(Requested) Above slab Rough-in
(Requested) Sheathing/Nailing-Wall
(Requested) Electrical -Permanent Power
Documents
File Name Date File Size
Certificate Of Occupancy.pdf 2023.12.26 141.08kB
Williams Blower Door Test.pdf 2023.12.26 748.87kB
Permit-000035521.pdf 2023.12.26 26.52kB
Permit-35521.pdf 2023.12.26 26.52kB