Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 664 SW LANGELIER DR FT. WHITE FL 32038
Parcel #: 04351-017
Acres: 19.50
Owner: Adriana Rafael
Subdivision:
Zoning: A-3/ESA-2
Flood Zone: X
District: 2
Application #: 31646
Permit #: 000035451
Related Permit: Culvert Waiver: 000002439
Submitted: Friday, June 16, 2017
Issued: Friday, June 16, 2017
Expires: Tuesday, February 13, 2018
Completed: Tuesday, February 13, 2018
Status: Completed
Septic Release? Yes
Notes:
1 FOOT ABOVE ROAD. NOC ON FILE. ROAD DEPT STATES ROAD IS PRIVATE- 06.21.17 PARTIAL FRAMING.08.23.17-TM
Job Details
This is the construction of a SFD/UTILITY
Heated Area (Sqft) 1080.00
Total Area (Sqft) 1584.00
Stories 1
Setbacks Front 30.00
Setback Side 1 25.00
Setback Side 2 25.00
Setbacks Rear 25.00
Septic# 17-0353-N
Power Company CLAY
Building Code Edition Florida Building Code 2014 5th Edition & 2011 National Electrical Code
Fema map number 12023C0533C
Review Notes
Contractors
Name/ Business License Title Role
Garrett Buzbee
G Buzbee, Inc
County License & State License & Liability Insurance Expired.
CGC061980 Cert General
Inspections
Inspection Notes Performed By Date
Temporary Power Inspection Tommy Matthews 6/19/2017
Foundation Inspection Tommy Matthews 6/27/2017
Setback Inspection Tommy Matthews 6/27/2017
Underslab Rough Plumbing Inspection Tommy Matthews 7/11/2017
Slab Inspection Tommy Matthews 7/14/2017
Perimeter Beam/Column Inspection Tommy Matthews 8/4/2017
Sheathing and Nailing Inspection Tommy Matthews 8/21/2017
Framing Inspection Tommy Matthews 10/17/2017
Rough-In Plumbing Inspection Tommy Matthews 10/17/2017
Electrical Rough-In Inspection Tommy Matthews 10/17/2017
Heat and Air Duct Inspection Tommy Matthews 10/17/2017
Septic Release Inspection Health Dept 1/18/2018
Passed: Electrical - Permanent Power Tommy Matthews 1/19/2018
Release to power company Tommy Matthews 1/19/2018
Final Inspection 2/13/2018
Passed: Building - Final Tommy Matthews 2/13/2018
CERTIFICATE OF OCCUPANCY/COMPLETION DATE 2/14/2018
(Requested) Under Slab Rough-in
(Requested) Beam (Lintel)
(Requested) Insulation
(Requested) Framing
(Requested) Above slab Rough-in
(Requested) Electrical Rough-in
(Requested) Heat & AC-
Documents
File Name Date File Size
Permit-000035451.pdf 2023.12.26 434.43kB
Certificate Of Occupancy.pdf 2023.12.26 141.87kB
Permit-35451.pdf 2023.12.26 434.43kB